Laserfiche WebLink
The CONTRACTOR shall, without charge, permit the landowner, included in the bid prices of the various work items. <br /> mining companies,and such other CONTRACTORS to use the roads <br /> and other facilities constructed or improved by the CONTRACTOR for 24, WORK PROGRESS <br /> the contract work;provided,that such usage shall in no way interfere <br /> with the contract work of the CONTRACTOR. The'CONTRACTOR agrees that work will be performed with due. <br /> diligence in accordance with good engineering and construction <br /> 17. ACCESS AND WORKING AREA practices to the end that the entire contract work shall be completed <br /> within the time specified in the Bid Solicitation memorandum. It is <br /> Access to the sites or to the vicinity of sites is by public roads and expressly understood and agreed,by and between the parties hereto, <br /> private roads as shown on the drawings or as may be located in the that the stipulated project schedule,described is a reasonable time for <br /> field. Some sites may not have adequate access roads for completion of the work,taking into consideration all factors,including <br /> CONTRACTOR'S methods or equipment and construction or average climatic conditions prevailing in the area. <br /> improvement of existing roads maybe required. Access roads used <br /> or constructed by the CONTRACTOR shall be maintained and For good and sufficient cause,such as(a)unsuitable weather, (b) <br /> restored to pre-existing or better conditions. faulty workmanship, © improper superintendence, (d) the <br /> CONTRACTOR'S failure to carry out any reasonable order or to <br /> The CONTRACTOR shall confine his access roads,equipment,the perform any provision of the purchase order and collateral documents, <br /> storage of materials and the operation of his workmen to the or(e)any other circumstance unfavorable for prosecution of the work, <br /> immediate vicinity of the work sites and shall not unreasonably the OWNER shall have the right to suspend the CONTRACTOR'S <br /> encumber the premises with his materials and equipment. Caution performance of the work. Notice of such suspension shall be in <br /> shall be exercised at all times to avoid.blocking roads or in any other writing. The CONTRACTOR shall resume performance of the work <br /> way interfering with operations by others or presenting a hazard to promptly when so notified in writing. The CONTRACTOR shall not be <br /> personnel,equipment,or to the public. entitled to any cost or damages resulting from such suspension. <br /> There will be added to the time estimated for the project t work noted <br /> The CONTRACTOR shall provide such temporary barricades,fences, in the Special Conditions the number of days, if any, that the <br /> or warning signs as may be necessary to make temporary or CONTRACTOR is allowed for reasons of unusual,unsuitable weather <br /> permanent roads safe by night as well as by day. He shall at all times as stipulated above. No extension of time shall be allowed for <br /> have a sufficient number of watchmen,flagmen,and warning lights reasons as stipulated in(b),(c),and(d)above. <br /> to protect traffic where it is interfered with by his operations,where his <br /> trucks enter or leave public roads, or where work is being done If the CONTRACTOR is responsible for a delay in progress of the <br /> adjacent to such roads. work the CONTRACTOR shall,without additional cost,work overtime <br /> and utilize such additional equipment and manpower as may be <br /> 18. PERMITS,LICENSES AND REGULATIONS necessary to complete the contract work by the stipulated date. <br /> Failure to comply will be grounds for termination of this Agreement as <br /> Permits and licenses required for prosecution of the work shall be stipulated below or assessment of liquidated damages as stipulated <br /> procured and paid for by the.CONTRACTOR. under the Liquidated Damages clause of these General Conditions. <br /> 19. ROYALTIES AND PATENTS If the CONTRACTOR should fail to prosecute the work properly and <br /> diligently,or default performance of any provision of the purchase <br /> The CONTRACTOR shall pay all royalties and license fees. He shall order and its collateral documents, the OWNER after seven days <br /> defend all suits or claims for infringement of any patent rights and written notice to the CONTRACTOR and his surety may, without <br /> shall save the State of Colorado harmless from loss on account prejudice to any other remedy the OWNER mat have,dismiss the <br /> thereof. CONTRACTOR and complete the work,and may deduct the cost of <br /> so doing from any unpaid balance of the contract price due or to <br /> 20. PROJECT PUBLICITY become due the CONTRACTOR. If such cost of completion of the <br /> work is in excess of the unpaid balance of the contract price, the <br /> The OWNER will be sole provider of information about the project CONTRACTOR shall reimburse the OWNER for such excess or the <br /> work to area residents,and special districts,county,state,and federal OWNER shall have cause of action at law for the amount of such <br /> agencies,and individuals from the media. Any contract with these excess and all costs of prosecution of such action. <br /> groups by the contractor must be cleared through the OWNER. <br /> 25. ESTIMATED QUANTITIES <br /> 21. HISTORICAL PRESERVATION <br /> The CONTRACTOR shall understand that the quantities and <br /> Areas adjacent to the mine sites often contain related artifacts and measurements set forth in the Special Conditions are in no case <br /> structures,such as buildings,tipples,ore houses, headframes and exact and in some instances the exact quantities and measurements <br /> foundations that may be historically significant. Care shall be are impossible to determine until after conditions have become known <br /> exercised to avoid any disturbances to these structures and artifacts, during construction; that the quantities shown in the Special <br /> Conditions are for use as a basis for comparing bids only. The <br /> in order to preserve their integrity. Existing structures shall not be <br /> used as load-bearing devices. OWNER does not expressly,or by implication,agree that the actual <br /> amount of work performed or material furnished or installed will <br /> 22. UTILITIES correspond therewith and further,that during the progress of the work <br /> the OWNER may find it advisable and shall have the right to make <br /> Utilities,both underground and above-ground,may exist which could changes in locations of portions of the work,to omit portions of the <br /> affect construction work covered under this contract. The work and to increase or decrease the quantities,as may be deemed <br /> CONTRACTOR is responsible for determining the nature and necessary or desirable. Under no circumstances or conditions will the <br /> locations of any and all utilities which could affect construction work CONTRACTOR be paid anything on account of anticipated profits <br /> covered under this contract. The horizontal and vertical locations of upon the work or any portion thereof covered by the Contract which <br /> utilities may vary. The CONTRACTOR is responsible for excavation is not actually performed;nor will the CONTRACTOR be paid more <br /> and equipment movement without damage to utilities. The than the unit price bid for any item of the bid because the actual <br /> CONTRACTOR assumes all responsibility for damages to any utilities quantity is greater or less than the quantity shown in the Invitation and <br /> he causes under this contract. Bid Sheet. <br /> 23. ELECTRICAL POWER AND POTABLE AND Measurements of any openings have been made in sufficient detail <br /> CONSTRUCTION WATER to establish general shapes and dimensions. The locations and <br /> dimensions of vertical and horizontal openings and depth of materials <br /> The CONTRACTOR shall be responsible for providing electrical shown on the documents as waste material,soil and unconsolidated <br /> power and potable and construction water as needed to perform the material and rock material are approximate measurements only and <br /> contract work. If the CONTRACTOR desires to use power other than shall be verified by excavation. <br /> portable generators,the CONTRACTOR'S plans for providing such The OWNER,without invalidating the purchase order contract,may <br /> power will be subject to the OWNER'S prior approval. The cost for order extra work,or make any other reasonably related changed by <br /> providing power and water will not be paid for separately but shall be <br /> altering,adding to or deducting from the work;the contract price and <br />