Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE M IM's <br />Mine Site Evaluation JUL 8 z?08 <br />State ProLyram <br /> <br />1. Permittee/Person 9. Permit Number Minis amaUon. 10. Permit Type <br /> SENECA COAL CO. luty <br />C-005-80 PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> P. O. BOX 670, C/O ROY KA 06/10/2008 *** Y? <br />3. City 4. State mm - dd - yyyy <br />HAYDEN <br />CO 14. Permit Status 15. Site Status 16. Facility Type <br /> 7A AN AE <br />5. Zip Code 6. Phone Number <br /> 17. <br />OSM Office # 18. CCID # 19. Land Code <br />81639- (970) 276-5217 140 SF <br />1 ::1 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> El ROUTT <br />Mine Name <br />8 05-00304 <br /> . <br /> E <br />E 23. AVS Permittee Entity ID Number 24. State. Office <br />_ <br />N <br />CA #II <br />S <br /> 084730 j F <br />25. Hours 26. Signature Block 27. Reviewing Offici l: <br />0.0 a. Permit Review `''nZ' %/!r <br /> <br /> <br />0.0 b. Site Visit Time Signature: Signature: <br /> C. BELKA <br />0.0 c. Travel Time <br />i <br />P <br />t <br />d N Review Date: I / ?F / l7 p <br /> r <br />n <br />e <br />ame: mm - dd - <br />YYYY <br />0.0 d. Report Writing Date: 07/01/2008 Is Supplemental MSE Page Used Y/N Y? <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR.... Citizen Complaint Referral (non site visit) <br />0xx ....Oversight RFx.... Reclamation Fees CC,,.,,, Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />ppermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR...Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />h <br />t <br />t <br />d <br />d <br />h <br />l <br />t <br />i <br />f <br />ave s <br />ar <br />e <br />an <br />w <br />ere coa <br />mining opera <br />ions cessat <br />on o <br />mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP <br />A <br />ti <br />C <br />l P <br />d <br />i <br />C <br />l <br />i <br />i <br />P <br />f <br />R <br />.. <br />ve <br />c <br />oa <br />ro <br />uc <br />ng: <br />oa <br />sur <br />ace m <br />n <br />ng <br />1...Phase I <br />elease: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant; P2.. Phase II Release: At least Phase 11 bond release WC.WiIdcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) Pagel of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). Revised December a, 1998 <br />?0 9 (?V