My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-18_INSPECTION - C1980001
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980001
>
2008-07-18_INSPECTION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:45 PM
Creation date
7/18/2008 1:33:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Inspection
Doc Date
7/18/2008
Doc Name
OSM Inspection Report
Inspection Date
6/10/2008
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />??EN OFrh <br />ENT °` , U. S. DEPT. OF THE INTERIOR QP? i F%f <br />? o <br />p OFFICE OF SURFACE 1VIV" <br />Vt M <br />o D o <br />Mine Site Evaluation ?.? <br />rcb <br />0 State Program OFSURFAG? <br />3. <br />JUG 1 A Anna <br />1. Permittee/Person 9. Permit Numbepj 10. Permit Type <br /> PITTSBURG & MIDWAY COAL CO. C-001-80 Mining and Safety PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> 4601 DTC BLVD., SIXTH FLO 06/10/2008 O? Y? <br />3. City 4. State mm - dd - yyyy <br /> <br />F 14. Permit Status 15. Site Status 16. Facility Type <br />Denver CO <br />A? AN ADE <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />F80237 (303) 930-3600 <br />140 SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. Stat e Abrev. 22. County Name <br /> F <br /> 00303 <br />05 El ROUTT <br />8 <br />Mine Name - <br /> . <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />EDNA <br /> 1 104016 <br />25. Hours 26. Signature Block 27. Reviewing Official: <br />0.0 a. Permit Review k <br />L-E <br />I <br /> <br />0 <br />0 <br /> <br />b. Site Visit Time Signature: _ <br />Signature: <br /> . C.BELKA <br /> - <br /> <br />Travel Time <br />0 c <br />0 Review Date: <br />7 / 1f/ v <br />. <br />. Printed Name: mm - dd - yyyy <br />0.0 d. Report Writing Date: 07/01/2008 Is Supplemental MSE Page Used Y/N Y? <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR.... Citizen Complaint Referral (non site visit) <br />0xx ....Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />permitted but not yet disturbed. A131 Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN.... Inactive (Permanent Program Permit): Phase 11 completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR..•Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />erations cessation of minin <br />ursuant to 30 CFR 816/ tion of forfeited site is in <br />ro <br />ress <br />h <br />l m <br />n <br />h <br />t <br />t <br />d <br />d <br />g p <br />p <br />ave s <br />w <br />ere coa <br />ini <br />g op <br />g <br />. <br />ar <br />e <br />an <br />have not begun. 817.131 b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase 11 bond release WC.WiIdcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H ... Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeenc y's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) Page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). Revised December 4, 1998 <br />1,?.,P
The URL can be used to link to this page
Your browser does not support the video tag.