My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-18_PERMIT FILE - M2008006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008006
>
2008-07-18_PERMIT FILE - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:45 PM
Creation date
7/18/2008 1:25:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
PERMIT FILE
Doc Date
7/18/2008
Doc Name
CDOT objector letter & response
From
Applegate Group, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lined Pit Guide 14 September 2000 <br />SUMMARY <br />Applicants proposing a developed water resources post mining land use through installation of slurry <br />walls and clay liners may post a smaller reclamation bond through selection of the regulated <br />construction option. If the factors that relate to the performance of slurry wails and clay liners <br />discussed in this memo are addressed in the permit application, Operators will be eligible for the lower <br />bond amount. These factors are addressed by supplying design plans, drawings, specifications, and a <br />quality assurance plan that will be enforceable components of the reclamation permit. Applicants must <br />also provide a statement that the plans and specifications, once approved, could not be altered without <br />consent by the Division. The operator would be required to advise the Division of the schedule for <br />construction so that inspections could be scheduled at appropriate times during installation. The <br />operation would be further required to provide a construction report detailing the installation of the <br />slurry wail or liner, describing any problems that occurred, and listing the results of testing that was <br />conducted under the approved quality assurance/quality control plan. A certification would be required <br />to accompany the construction report with a statement from the quality assurance engineer that the <br />facility was constructed in accordance with the approved plans and specifications. The Division of <br />Minerals and Geology encourages Applicants to use permit commitments and contingencies to reduce <br />the amount of bond required for permitting of slurry walls and clay liners. The basis of any bonding <br />scheme is predicated on the basis for all reclamation bonding; that at any point in the life of the <br />operation of a pit, the state must hold sufficient bond to implement the approved reclamation plan and <br />establish the approved beneficial post mining land use. <br />ATTACHMENTS: Policy memo dated 3/29/00 on lined: sand and gravel pits, 6 pages. <br />Addendum to the 3/29/00 policy memo, dated 5/9/00, 2 pages. <br />m:\min\acsVined pit guide.doc
The URL can be used to link to this page
Your browser does not support the video tag.