My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-18_PERMIT FILE - M2008006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008006
>
2008-07-18_PERMIT FILE - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:45 PM
Creation date
7/18/2008 1:25:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
PERMIT FILE
Doc Date
7/18/2008
Doc Name
CDOT objector letter & response
From
Applegate Group, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lined Pit Guide 10 September 2000 <br />first excavating a trench with a flat floor and sloping sides around the perimeter of the reservoir at the <br />midpoint of the wedge of soil liner fill that will be installed. Trench excavation continues until <br />impermeable material is penetrated to the depth listed in the specifications. The keyway is backfilled <br />with soil liner fill that is compacted in accordance with the specifications. <br />Soil Liner Cover Fill <br />The design should describe the materials that will be used to bury the soil liner and the depth of burial <br />to prevent desiccation, freeze-thaw effects, and erosion. Typically, the wedge of soil liner fill may by <br />covered by several feet of random fill, and the reservoir perimeter protected from wave erosion by a <br />layer of pit run gravel or riprap depending on the size of the water surface and the anticipated wave <br />generation. <br />Specifications <br />The Division of Minerals and Geology does not require that Applicants provide the complete set of <br />technical specifications for a soil liner project. However, certain elements of the specifications should <br />be incorporated into the reclamation permit to become eligible for the lower bond under the regulated <br />construction option. These elements are outlined in the following-list of typical examples: <br />Submittals - Provide a basic earthwork operations plan and schedule for the installation of the soil <br />liner and the soil liner cover fill. Include a description of the equipment and quality control <br />procedures to be used, including lift thickness control, composite material preparation, and methods <br />for moisture conditioning. <br />Materials - Soil liner and soil liner cover fill shall be free of organic matter, debris, frozen material, <br />and other deleterious materials. Soil liner fill shall be excavated from approved borrow areas and <br />conform to the following (example) specification: <br />U.S. Standard Percent Passing <br />Sieve Size by Dry Weight <br />3/4-inch 100 <br />3/8-inch 70-100 <br />No. 4 50-100 <br />No. 40 20-50 <br />No. 200 20-50 <br />Plasticity Index. 10 minimum <br />Excavations - Excavations shall be graded and properly maintained to provide adequate drainage at <br />all times. Work shall be suspended when the site is overly wet, muddy, or otherwise unsuitable for <br />proper maintenance. In excavations where soil liner fill is to be placed on slopes steeper than
The URL can be used to link to this page
Your browser does not support the video tag.