Laserfiche WebLink
October Ore Pile Reclamation <br />110(d) Limited Impact Permit Application <br />Nuvemco LLC <br />Exhibit C <br />6.3.3 (1) (1) Hydraulic balance and site stabilization <br />The ore pile site will be returned to the original topographic contours and the <br />surface reclaimed and vegetated to prevent any offsite damages or changes in the <br />surface hydrology of the area. <br />6.3.3 (1) (m) On site processing <br />NA. There will be no onsite operations other than loading the ore and removing it <br />from the area. <br />6.3.3 (1) (n) Secondary commodities to be mined <br />No mining will take place. An existing ore body containing uranium and <br />vanadium will be removed from the site. <br />6.3.3 (1) (o) Explosives <br />No explosives will be utilized. <br />6.3.3 (2) (a-d) Tailing ponds - milling process <br />NA. No milling or tailings are associated with October Ore Pile Reclamation <br />operations. <br />19