Laserfiche WebLink
TABLE 2 CONTINUED <br />Well Status Date Comment <br />20-76 Plugged & Abandoned 9/6/04 Vegetation and storm water management ongoing <br /> on pad and access road. Well skid remains on pad. <br /> Well failed MIT in 2004. Interim reclamation on top <br /> soil pile only - 0.02 acres in 2 <br />000. <br />21-15 Plugged & Abandoned 6/18/04 . <br />Well pad and road contoured and reseeded. <br /> Approximately 0.6 acres reclaimed in 2005 <br />21-16 Plugged & Abandoned 9/8/04 Well pad and road contoured and reseeded. <br /> Approximately 0.5 acres reclaimed in 2005 <br />28-17 i Plugged & Abandoned 6/15/04 Well pad and road contoured and reseeded. <br /> Approximately 0.8 acres reclaimed in 2005 <br />28-21 Long term stand-by 7/21/04 Vegetation and storm water management ongoing. <br /> Bridge Plugs Set Lateral Piping and well skid in place. Well passed <br /> MIT 2006. Interim reclamation on top soil pile only <br /> 0.03 acres in 2000. <br />28-41 Plugged & Abandoned 6/16/04 Well pad and road contoured and reseeded. <br /> Approximately 0.9 acres reclaimed in 2005 <br />29-20 Plugged & Abandoned 9/9/04 Well pad and road contoured and reseeded. <br /> Approximately 0.3 acres reclaimed in 2005 <br />29-22 Plugged & Abandoned 9/9/04 Vegetation and storm water management ongoing <br /> on pad and access road. Well skid remains on pad. <br /> Well failed MIT in 2004. Interim reclamation on top <br /> soil pile only - 0.04 acres in 2000. <br />29-23 Plugged & Abandoned 10/24/06 Vegetation and storm water management ongoing <br /> on pad and access road. Well skid remains on pad. <br /> Well failed MIT in 2004. Well was not P & A until <br /> 2006 due to rig availability. Interim reclamation on <br /> to soil pile only - 0.02 acres in 2000. <br />29-24 Plugged & Abandoned 9/8/04 Vegetation and storm water management ongoing <br /> on pad and access road. Well skid remains on pad. <br /> Well failed MIT in 2004. Interim reclamation on top <br /> soil pile only - 0.4 acres in 2000. <br />29-26 _ <br />Long term stand-by 8/13/04 Vegetation and storm water management ongoing. <br /> Bridge Plugs Set Lateral Piping and well skid in place. Well passed <br /> MIT 2006. Interim reclamation on top soil pile only - <br /> 0.05 acres in 2000. <br />. <br />29-27 Long term stand-by 7/28/04 Vegetation and storm water management ongoing. <br /> Bridge Plugs Set Lateral Piping and well skid in place. Well passed <br /> MIT 2006. Interim reclamation on top soil pile only - <br /> 0.02 acres in 2000. <br />29-28 Long term stand-by 8/26/04 Vegetation and storm water management ongoing. <br /> Bridge Plugs Set Lateral Piping and well skid in place. Well passed <br /> MIT 2006. Interim reclamation on top soil pile only - <br /> 0.02 acres in 2000. <br />29-29 Long term stand-by 8/19/04 Vegetation and storm water management ongoing. <br /> Bridge Plugs Set Lateral Piping and well skid in place. Well passed <br /> MIT 2006. Interim reclamation on top soil pile only - <br /> 0.03 acres in 2000. <br />29-34 Long term stand-by <br />Bridge Plugs Set <br />American Soda. LIP <br />DBMS Annual Report <br />July 10, 2008 <br />8/24/04 Vegetation and storm water management ong <br />Lateral Piping and well skid in place. Well paE <br />MIT 2006. Interim reclamation on top soil pile <br />15