Laserfiche WebLink
.................... <br />ADJUSTED COSTS .. .. .......:, ..,....._:....:.:...................... <br />Ownership Costs <br /> <br />Depreciation CFC Overhead <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $18.23 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $18.23 NA NA $7.24 $13.57 $8.05 $13.09 NA NA NA NA <br />-Attachment no. 2: NA NA NA $1.21 $1.30 $2.21 $1.31 NA NA NA NA <br />Annual usage : $27.50 $12.34 $17.29 NA NA NA NA NA NA NA NA <br />Double shifts : $20.62 $6.17 $8.64 NA NA NA NA NA NA NA NA <br />Triple shifts : $18.34 $4.11 $5.76 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $5.65 NA $6.28 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.94 NA $1.72 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $30.56 $5.97 $0.00 $2.01 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.34 $0.00 $1.09 <br /> <br />ADJUSTED COST SUBTOTALS <br /> <br /> <br />epreciation ......... ....... <br />Ownership Costs <br /> <br />CFC ........... ....._..._..... <br /> <br /> <br />Overhead ...........................................: <br /> <br />Overhaul <br />Labor Parts :::::.............-.-.-.-.-:.......:.::::::....._:::::.:::::::.:::.:::.::::.::::.:::::::::::::.::::::::::::::::.::::::::::::::::::::::.:: . <br />Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2 : Dozer and ROPS : <br />Single shifts : $27.50 $12.34 $17.29 $5.65 $13.57 $6.28 $13.09 $30.56 $5.97 $0.00 $2.01 <br />Double shifts : $20.62 $6.17 $8.64 ttachment no. 2 <br />Triple shifts : $18.34 $4.11 $5.76 $0.94 $1.30 $1.72 $1.31 $0.00 $0.34 $0.00 $1.09 <br />.::.:. ::::::.: :. .::.. :.::.::.. . <br />.....::::.. <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk-Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (-70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br /> <br />............. .. ............. .... .... ....... ::::::::::.::.::. <br />.::.. <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul Operator Total <br /> Machine Attachments Cost/hr ($) <br /> Single shifts : $57.13 $77.13 $6.71 $32.78 $173.74 <br /> Double shifts : $35.44 $77.13 $6.71 $32.93 $152.20 <br /> Triple shifts : $28.21 $77.13 $6.71 $33.03 $145.07 <br /> <br /> <br />EQUIPMENT PERFORMANCE DATA <br /> <br />Description <br />Horsepower <br />(FHP) <br />Transmission <br />Type <br />Weight <br />(UST) <br />Length <br />(ft) <br />Width <br />(ft) <br />Height <br />(ft) , . <br />Fuel <br />type .... ......... . <br />Ripper <br />type <br />Dozer : Cat D6R Series 11- 8SU (2 310 NA 41.8 22.7 8.7 11.5 diesel NA <br />Blade: Semi-Universal NA NA 5.4 NA 12.9 5.5 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2 : 3-shank ripper NA NA 5.4 3.6 7.1 2.6 NA Adj. Parallelogram <br />i otai weignt :1 oz.o (us i I