Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 15K GVW $49.28 1 $49.28 $49.28 <br />-Light Duty Pickup, 4x4, 314 T. $33.43 1 $33.43 $33.43 <br />-Centrifugal pump - 200M, 10 in. $89.65 4 $358.60 $358.60 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $441.31 <br />......:.:.:::.:::::::::.....:.. <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : <br />Transportation Cycle Time : Non- Total one-way travel distance : <br />Roadable Roadable Average travel speed : <br />Equipment Equipment <br />Haul time (hours) = 0.14 0.14 Total non-roadable mob/demob cost <br />Return time (hours) = 0.14 0.14 two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost <br />Unloading time (hours) = 0.50 NA one round trip, no haul rig <br />Subtotals = 1.29 0.29 <br />................................ .::..::........:.::.::.::.:.............. <br />JOB TIME AND COST Total job time : <br />Total job cost : $441.31 <br /> <br /> <br />Craig <br />5.0 miles <br />35.0 mph <br /> <br />$722.74 <br /> <br />$126.09 <br /> <br /> <br />................. <br />2,57 hours <br />$849