Laserfiche WebLink
... . <br />FORBS: <br />sheet 9 of 9 <br />'5NK1Jbb AND I HELS (seed) : <br />aeeo application metnoo : DnY Seeding (DMG survey d <br />vx-x <br />MULCHING and MISCELLANEOUS DESCRIPTION (data source <br />Materials item no. 1 :No mulch materials required <br />item no. 2: <br />item no. 3: <br />item no. 4: <br />TOTAL SEED APPLICATION COST / ACRE <br /> <br />NURSERY STOCK PLANTING TYPE and SIZE <br />COMMON NAME NO. / ACRE (planting cost data source) <br />MATERIAL <br />COST / PLANT ........ ....... <br />PLANTING <br />COST / PLANT ... . <br />COST / FERT. <br />PELLET .. . <br />TOTAL <br />COST / PLANT <br />TOTAL <br />COST 1 ACRE <br />No nursery stock required <br /> <br /> <br /> i <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST / ACRE : <br />JOB COST No. of acres : 1.00 Cost / acre : $1,042.48 INITIAL JOB COST : $1,042.48 <br />Estimated failure rate (percent) : 40.00% Cost / acre": $1,042.48 RESEEDING JOB COST : $416.99 <br />Selected replanting work items : T S N TOTAL JOB COST : $1,459 <br /> <br />TOTAL MULCH MATERIALS COST / ACRE : 1$0.00 <br />Application -method no. 1 :No mulch application required <br />method no. 2 <br />method no. 3: <br />TOTAL MULCH APPLICATION COST / ACRE : ;$0.00