Laserfiche WebLink
the most acceptable way to model and understand the effects of the reclaimed site conditions <br />would be to create an existing model with the updated topography for the site that can be <br />' compared to the proposed model. <br />Three cross sections across the site were cut using the updated topography and then converted to <br />the NGVD 29 datum for use in the existing model. There were no indications that the land use and <br />' ground cover has changed drastically since the creation of the effective model. Therefore, the <br />Manning's n values used in the effective model remain valid and were used in the existing model. <br />Information relating to the floodplain permit for property east of the Serfer Property was <br />unavailable from Larimer County, Weld County, Town of Windsor and Anderson Consulting. ,. <br />' Therefore, we left the hydraulic model unchanged to the east of SerFer property. <br />The effective model was modified to reflect the updated topography for the site. Cross Sections <br />153515, 154485 and 155595 in the HEC-2 model were updated; these relate to cross section C, D <br />' and E on the work maps. Updating these cross sections results in the following changes to the <br />model shown in Table 1 below: <br />Existing Conditions Water <br />Elevation Surface Elevation <br />NA 148960 4780.7 4780.7 0.0 <br />' NA 149580 4781.35 4781.35 0.0 <br />NA 151100 4782.85 4782.83 0.0 <br />NA 152250 4785.47 4785.43 0.0 <br />NA 152300 4785.66 4785.63 0.0 <br />*A 152340 4787.65 4787.6 0.0 <br />* B 152390 4787.66 4787.61 -0.1 <br />' *C 153515 4787.84 4787.86 0.0 <br />*D 154485 4789.13 4788.81 -0.3 <br />*E 155595 4790.26 4789.78 -0.5 <br />' F 156815 4793.27 4792.53 -0.7 <br />G 156865 4794.24 4794.39 0.2 <br />H 156905 4794.57 4794.81 0.2 <br />1 156955 4795.15 4795.24 0.1 <br />J 157720 4796.62 4796.61 0.0 <br />K 159000 4797.36 4797.36 0.0 <br />L 159805 4797.75 4797.75 0.0 <br />' On Site Cross Sections <br />Table 1: Effective vs. Existing Conditions <br />No other information in the model was altered other than the topography for those cross sections. <br />Printouts of the input and the output for the HEC-2 model are in the located in Attachment G of this <br />document. Graphs comparing the cross sections are included for your reference in Attachment E. <br />'File proposed mining limits for this property are located entirely within the delineated floodway <br />I for the Cache la Poudre River. In order to eliminate negative impacts on the floodway during the <br />proposed mining operations, the applicant proposes not to store any stockpiles or overburden at <br />Serfer Pit Floodplain Development Permit