My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-06-07_GENERAL DOCUMENTS - C1981048 (3)
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1999-06-07_GENERAL DOCUMENTS - C1981048 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2021 1:40:23 PM
Creation date
7/17/2008 11:39:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/7/1999
Doc Name
PKA-9-440
From
DRMS
To
All Bidders
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
about 57 feet along the slope (approximately 28 feet vertical feet) below the road. See <br /> Figure 4A. Approximately 50 cubic yards of material will be required. Material from the <br /> excavation of the new channel in Task 4 may be used. A runoff ditch.will be excavated along <br /> the inside of the access road beginning above the gully and ending in an existing runoff ditch <br /> located approximately 100 feet downhill from the gully. Runoff will be channeled into the <br /> existing ditch that carries runoff to a culvert located about 350 feet down the road from the <br /> gully. In areas where the road is too narrow for the excavation of a ditch, the access road will <br /> be inclined into the hillside via cut and fill. The inside half of the road will be excavated two <br /> feet deep and the material will be filled on the outside half of the road so that runoff will be <br /> carried along the inside of he road. See Figure 4B. <br /> 5. Task 9—There are 14 staked locations where cuts will be excavated into the upland diversion <br /> ditch. <br /> 6. Task 11 —Six road dips will be installed in the access road. Figure 5A shows typical road dip <br /> specifications. <br /> 7. The time for completion of the project has been extended from 26 calendar days to 33 <br /> calendar days. The Las Animas County Road and Bridge Department will be installing the <br /> culvert beneath the County road (see Task 4) during the last week of July. Please plan Task <br /> 4 work accordingly. <br /> 8. All terms and conditions of the Invitation and Bid other than as changed by this amendment <br /> remain the same. <br /> 9. Receipt and acceptance of this amendment shall be acknowledged on the bid form. <br /> M:\imp\gsc\tbmbid.amd <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.