Laserfiche WebLink
F <br /> Trinidad Basin Mine Project <br /> Bid Schedule <br /> PKA-9-440 <br /> Item 2—Reclamation Tasks: <br /> Task Description Bid Amount <br /> 2 Remove pond 15-P1 $ /04 000 eo <br /> 3 Remove Diversion 15-D1, Realign Diversion 15-D3 $ 1,50 v m; <br /> 4 Realign stream channel in Section 15 $ l7. 70,0 <br /> 5 Restore spillway on Pond 15-P2 $ o <br /> 6 Grading &culvert maintenance on east-west access road $ G ere <br /> 7 Install single fence rock check dam on east-west access road $ 15'0 0 s� <br /> 8 Install rip-rap in channel south of Pond 15-P2 $ `J 9 zo <br /> 9 Partial removal of diversion ditch 22-D4 $ ap 6 m� <br /> 10 Gully repair on north-south access road $ "q a 0 <br /> 11 Install road dips on north-south access road $ g do <br /> 12 Remove culverts on north-south access road $ /000 <br /> e-o <br /> 13 Reseeding slope in section 22 $ -26o m <br /> 14 Reseeding slope and weed spraying in section 15 $ .?o®o <br /> 15 Revegetation, per specs $ 2 rO o e� <br /> Total (Enter here and on Page 1 of Bid Schedule, Item 2) $=, /7o ' ' <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 2 of 2 Pages <br />