Laserfiche WebLink
Trinidad Basin Mine Project <br /> Bid Schedule <br /> PKA-9-440 <br /> Item 2— Reclamation Tasks: <br /> Task Description Bid Amount <br /> 2 Remove pond 15-P1 $ <br /> 3 Remove Diversion 15-D1, Realign Diversion 15-D3 $ 500 <br /> .00 <br /> 4 Realign stream channel in Section 15 $ <br /> 5 Restore spillway on Pond 15-P2 $ a 3 5 S , ®0 <br /> 6 Grading & culvert maintenance on east-west access road $ ©.n P-a <br /> 7 Install single fence rock check dam on east-west access road <br /> w '7 <br /> 8 Install rip-rap in channel south of Pond 15-P2 $ o 0 0 <br /> 9 Partial removal of diversion ditch 22-D4 $ 1'0 0 0,3'O <br /> 10 Gully repair on north-south access road $ 0 Uo 010 0 <br /> 11 Install road dips on north-south access road $ a y o o, 00 <br /> 12 Remove culverts on north-south access road $ L4 o 0 <br /> 13 Reseeding slope in section 22 w v $ I S 0 0 ° <br /> 14 Reseeding slope and weed spraying in section 15 WV $ S o o ° <br /> W w <br /> 15 Revegetation, per specs $ o° 0 1 0 ° <br /> Total (Enter here and on Page 1 of Bid Schedule, Item 2) $ 5 l S 5 S,° 0 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 2 of 2 Pages <br />