Laserfiche WebLink
Ore <br />• <br />Wall or <br />Founda <br />N.T.S. <br />• <br />• <br />24° <br />aste <br />-ial <br />Clay Liner (GCL) <br />•ade/Foundation <br />N.T.S. <br />Cushion Material <br />Compacted <br />Soil Backfill <br />GCL <br />-:.. <br />GCL <br />?2J N.T.S. <br />Notes: <br />1. The Cushion Material shall be constructed to a minimum thickness of 2.5 feet. <br />2. Bentomat DN is proposed for use as the GCL, manufactured by CETCO Lining Technologies, or approved equivalent. <br />3. Squeegee materials shall be placed between the prepared subgrade and GCL as needed to prevent damage to the <br />GCL from underlying rock protrusions. <br />G 01, Proposed Liner System Details <br />M Denver, Colorado <br />CLIENT/PROJECT DRAWN KFM DATE 111012008 JUIS NU. 073-81745 <br />ENERGY FUELS RESOURCES CORP. CHECKED $ME DWGNOJREV.N <br />WHIRLWIND PROJECT KFM N.T.S. gV/A <br />REVIEWED JM J FILE NjinerSystem.xls FIGURE NO. 2 <br />Proposed Ore Pad Liner System <br />Granular Bentonite <br />\ Termination of Liner at Structure Embedded in Subgrade <br />1 Typical Anchor Trench Detail