Laserfiche WebLink
Whirlwind Mine Spill Prevention, Control <br />30100 5110 Road & Countermeasure Plan <br />Gateway, Colorado 81522 <br />r? <br />L <br />• <br />1. PURPOSE AND MANAGEMENT APPROVAL <br />This Spill Prevention, Control, and Countermeasure (SPCC) Plan provides information <br />and procedures to meet the requirements specified in Title 40, Parts 109 and 112 of the <br />Code of Federal Regulations (CFR). The SPCC Plan is to be followed by company <br />personnel when dealing with pollution prevention and spill emergencies. It is the intent <br />of Energy Fuels to comply with all applicable state and federal regulations pertaining to <br />oil storage and use. This can best be accomplished through good housekeeping, adequate <br />equipment, proper maintenance, and personnel adhering to proper procedures. <br />If, in spite of the best care, an accidental spill does occur, it will require the immediate <br />coordinated efforts of the various company personnel and, perhaps, the assistance of <br />outside agencies. Our goal, in the event of a release, is to limit damage to property, <br />wildlife and the environment. <br />The purpose of this SPCC Plan is to: <br />• Set forth procedures for preventive maintenance operations that are to be followed <br />by company personnel; <br />• Prevent spills or leaks from occurring; <br />• Provide appropriate designation of authority for the assignment of tasks to prevent <br />a spill or release; <br />• Provide an indication of priority and importance to a list of tasks that must be <br />done when a spill or release occurs; <br />• Respond with quick and effective spill containment procedures; <br />• Provide communication patterns to assure coordination of efforts; <br />• Provide reference materials to those responsible for the various duties that occur <br />as the result of a spill. <br />A copy of this SPCC Plan will be located at the Whirlwind Mine site and will be <br />available to mine personnel for review during normal work hours. This plan will be <br />amended as personnel change, equipment is modified, and as experience dictates <br />improvements. The plan will be reviewed for accuracy and compliance with federal <br />regulations at least once every five (5) years. <br />MANAGEMENT APPROVAL <br />Management approval has been extended to commit the necessary resources to <br />implement this SPCC Plan. The SPCC Plan will be implemented as herein described. <br />Signature: <br />Name: <br />Title: <br />Mr. Stephen Antony <br />Executive VP/Chief Operating Officer <br />2