Laserfiche WebLink
Whirlwind Mine <br />30100 5110 Road <br />Gateway, Colorado 81522 <br />0 5. TRANSFER OPERATIONS <br />Facility personnel must be present at the AST locations during all transfer operations of <br />oil products to ensure that procedures designed to prevent overfills are followed and to <br />provide immediate response in the event of a spill. The following procedures will be <br />followed when transferring oil products: <br />• Make the correct connections at all valve locking terminals; <br />• If delivering product, check to make sure that there is adequate tank capacity for <br />product delivery and fill the tanks carefully so that accidental overfills are avoided; <br />• Ensure that there are no line, terminal, or valve leaks. <br />• After the transfer is complete, drain the transfer hose before disconnecting to ensure <br />that spills do not occur. <br />In the event of oil overflow or valve/line leak, the Mine Foreman must ensure that the <br />delivery personnel and/or facility personnel correct the problem, contain the spilled <br />material, and contact appropriate management personnel. See Section 7 for specific <br />actions to be taken in the event of a spill or release. <br />• <br />•