My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-11_PERMIT FILE - M2007044 (19)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-07-11_PERMIT FILE - M2007044 (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:32 PM
Creation date
7/17/2008 7:49:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
7/11/2008
Doc Name
Table of contents and Appendix F (volume 2)
From
Energy Fuels Resources Corp.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />EMERGENCY RESPONSE PLAN WHIRLWIND MINE <br />PROCEDURE NO. WWA Revision No. 1 Replaces Procedure: N/A <br />Page: 7 of 11 Revision Date: 03/09/08 Dated: N/A <br />Stage 2 site response. All EFR and non-EFR personnel on the surface are to immediately proceed <br />to a designated assembly point when the Emergency Alarm Horn (Fire Alarm) is sounded. <br />2.2.2 Stage 2 Mobilization <br />All emergency responses to an emergency situation at the Whirlwind Mine will continue through <br />Stage 2 Mobilization. Mobilization for Stage 2 response operations consists of the assembly and <br />organization of site surface personnel for coordinated response operations and will terminate at the <br />end of mobilization if the emergency situation is successfully resolved at the First Responder level. <br />The site will demobilize and the Remediation Phase of the Emergency Response Plan will be <br />executed if the situation is resolved at the First Responder level. <br />Mobilization: Assembly <br />All surface personnel are required to report to a designated assembly point when the alert signal is <br />sounded. The primary assembly point for EFR personnel during a surface emergency situation is <br />the Fire Alarm Control Panel located on the outside wall of the mine office. The primary assembly <br />point for non-EFR personnel is the. Road Intersection Triangle. The Water Treatment Plant. is the <br />alternative assembly area if the primary assembly points are inaccessible. <br />• <br />Mobilization: Basic PPE Requirements <br />All personnel reporting for Stage 2 response operations will first don hard hats, safety glasses, and <br />steel-toed safety shoes. This is the minimum personnel protective equipment (PPE) required <br />during response operations. EFR personnel who are not wearing the minimum PPE listed above <br />will be restricted to support functions only during Stage 2 operations. <br />Mobilization: Mine Foreman (Emergency Coordinator - EC) <br />¦ Provide an initial situation report to all response personnel at the primary assembly point. <br />® Review the incident evaluation, determine a preliminary course of action, and delegate <br />specific duties to response personnel. <br />¦ Establish an incident command post at a secure location near the incident location. <br />¦ Establish a site command post with secure communication links to off-site entities at a <br />location unaffected by the incident and ensure that communications with the incident <br />command post and off-site entities are functional. <br />Organize response personnel fordeployment based upon the initial situation report and the <br />projected course of action. Response organization will include the delineation of <br />responsibilities or duties; the provision of proper PPE; the collection of specialized <br />equipment; and the establishment of a support base, including communications. <br />Establish a preliminary field response plan based upon the initial situation report and the <br />projected course of action. <br />• <br />ENERGY FUELS RESOURCES <br />HEALTH & SAFETY PROCEDURES
The URL can be used to link to this page
Your browser does not support the video tag.