Laserfiche WebLink
<br />.STATE OF COLORADO <br />To: Purchasin gent <br />Division of Anerals and Geology <br />1313 Sherman St., Rm. 215 <br />Denver, Colorado 80203 <br />BID <br />Project Name: Hawk's Nest Mine Reclamation <br />Bid Number: PKA-1-476 <br />Pre-Bid Meeting Date: August 23, 2000 Time: 10:30 am <br />Bid Opening Date: -September 5, 2000 Time: 2:30 pm <br />Total Bid $ 127, 957.00 <br />Receipt of Addenda Nos. AmPndmant_Nn _ 1 <br />is Hereby Acknowledged <br />1. BID: Pursuant to the advertisement by the State of Colorado dated August 3, 2000 the undersigned bidder proposes to <br />furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything <br />described or shown in or reasonably implied from the Biddingg Documents, including the Drawings and Specifications, for <br />the base bid above indicated, and according to the attacheWid Schedule. <br />2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the <br />Drawings and Specifications, and has examined the site of the work, so as to make certain of tie conditions at the site and <br />to gain a clear understanding of the work to be done. <br />3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those <br />named herein, and that no other bidder or prospective bidder has given any information concerning this Bid. <br />4. BID GUARANTY: This Bid is accompanied by the required Bid Guaranty. You are authorized to hold said Bid Guaranty <br />for a period of not more than thirty (30) days after the openin of the Bids for the work above indicated unless the <br />undersigned bidder is awarded the Contract, within said periodq in which event the Director, Division of Minerals and <br />Geology may retain said Bid Guaranty, until the undersigned bidder has executed the required Agreement and furnished <br />the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, Certificates of Insurance and any <br />other documents required by the Special Conditions. <br />5. TIME OF COMPLETION: The bidder a rees to com lete the entire project within 18 calendar days from the Notice <br />to Proceed, subject to Article 34 TIME%F COMPLETION and Article 40 LIQUIDATED DAMAGES, of The General <br />Conditions of the Contract. If awarded this work, the bidder agrees to begin work within ten (10) days from the date of the <br />Notice to proceed and agrees to prosecute the work with due diligence tqo completion. <br />6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, he must execute the required <br />Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and <br />Certificates of Insurance and any other documents required by the Special Conditions within ten (10) days from the date <br />of the Notice of Award. <br />7. The right is reserved to waive informalities and to reject any Bid. <br />(TYPEIPRINT NAME UNDER ALL SIGNATURES) Dated this 31st day of August _'2000 <br />THE BI <br />ZR <br />(Corporate Seal) <br />Signature <br />Collin R. Fay, Preside ft <br />- Name and I i e ype or nn e <br />Alpine Construction and Engineering, Inc. <br />: Company ame <br />P.O. Box 1311 <br />ress <br />Palisade, CO 81526 <br />ATTEST 84=1537167 <br />-5ecre a ny ax (9 o0ne 858'5001 <br />Signatures: If the Bid is being submitted by a Corporation, the Bid should be signed by an officer, i.e., President or Vice <br />President. The signature of the officer shall be attested to by the Secretary and properly sealed. <br />If the Bid is being submitted by an individual or a partnership, the Bid shall so indicate and be properly signed.