Laserfiche WebLink
TrPac of k- <br />Rocky Mountain Juniper (Juniperus <br />sco ulorum Serviceber Amelanchier alnifolia <br />Gambel's Oak Quercus ambelii Redosier dogwood corpus sericea <br />Narrowleaf cottonwood (populus Skunkbush sumac (Rhus trilobata) <br />an ustifolia <br />Measurement and Payment <br />Trees and shrubs will be paid for on a unit planted and accepted basis. Payment for this <br />task will be paid for at prices established in Item 7 of the Bid Schedule per plant <br />provided, planted and accepted. Such payment shall be considered full compensation <br />for all labor, materials, equipment and all other items necessary and incidental to <br />obtaining, and planting of trees and shrubs as directed and described in the <br />specifications. Payment will be as this task is completed and approved by the <br />PROJECT MANAGER. Payment for this task will be made only for the unit prices <br />shown under Item 7 of the Bid Schedule. <br />TASK 8 EQUIPMENT RENTAL <br />Additional areas in and adjacent to the Project Area may require slope reduction, <br />excavation or erosion control work. A CAT D-4C or equivalent 80 FHP machine with <br />operator, a CAT 416B Backhoe loader or equivalent 74 fhp machine with operator, and a <br />five (5) cubic yard on/off highway end dump truck with operator shall be furnished for <br />additional work as needed. <br />The hours outlined in Item 8 of the Bid Schedule are NOT guaranteed. All work will be <br />accomplished according to Specification 19.0, Equipment Rental, General Bid <br />Specifications, 1996. <br />Measurement and Payment ' <br />Payment shall be made as described in General Bid Specifications, 1996, Specification <br />19.0, Equipment Rental. Payment will be made at the unit prices established in Item 8 of <br />the Bid Schedule. The hours outlined in Item 8 of the Bid Schedule are NOT <br />guaranteed. <br />14