My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-08-30_GENERAL DOCUMENTS - C1981016 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981016
>
2000-08-30_GENERAL DOCUMENTS - C1981016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 6:47:47 AM
Creation date
7/16/2008 4:02:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
8/30/2000
Doc Name
PKA-1-476
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Measurement and Payment <br />Constructed drainages shall be measured to the nearest linear foot. Measurement for <br />payment will consist of physically measuring the length of each drainage. Payment for <br />this task will be paid for at prices established in Item 5 of the Bid Schedule per linear foot <br />constructed. Such payment shall be considered full compensation for all labor, <br />materials, equipment and all other items necessary and incidental to the drainage ditch <br />construction to the specifications. Payment will be as this task is completed and <br />approved by the PROJECT MANAGER. Payment for this task will be made only for the <br />unit prices shown under Item 5 of the Bid Schedule. <br />TASK 6 REVEGETATION <br />All areas subject to revegetation shall be scarified as described in Task 4, Incorporate <br />Materials, prior to beginning revegetation. Certified weed free straw mulch was applied to <br />the soil during completion of Task 4. Additional light mulching is required during <br />performance of Task 6, Revegetation. <br />All areas disturbed during reclamation work and any other areas specified in these <br />Special Conditions will be revegetated according to the Revegetation Specifications in <br />the General Bid Specifications. Commercial fertilizer is required for this project, and <br />will be supplied by CONTRACTOR. Seed will be supplied by the OWNER. <br />All areas disturbed during reclamation work and any other areas specified in these <br />Special Conditions will be revegetated according to the Revegetation Specifications in <br />the General Bid Specifications Section 20.0, except as modified by these Special <br />Conditions. <br />In addition to the revegetation specifications outlined in Section 20.0 attached, the <br />following requirements will be adhered to: <br />Seed <br />Seed will be provided by the OWNER. CONTRACTOR must give the PROJECT <br />MANAGER at least ten N 01 working days notice of the acreage to be seeded, so that <br />the proper amount of seed is delivered. Hand written acreage calculations are <br />acceptable. <br />Fertilizers <br />Commercial fertilizer is required for this project. Fertilizer shall be provided by <br />CONTRACTOR, and shall conform to Section 20.2 (commercial fertilizer) of the <br />Revegetation Specifications. <br />Seedbed Preparation <br />Seedbed preparation was accomplished during performance of Task 4, Incorporate <br />Materials. <br />10
The URL can be used to link to this page
Your browser does not support the video tag.