Laserfiche WebLink
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 N o f <br /> Phone:(303)866-3567 [MtIN7ERALS <br /> FAX:(303)832-8106 <br /> GEOLOGY <br /> RECLAMATION <br /> MINING•SAFETY <br /> Owens <br /> DATE: July 14, 1999 Golveernor <br /> Greg E.Walcher <br /> TO: Interested Contractors Executive Director <br /> Michael B.Long <br /> FROM: Steve Renner, Division of Minerals and Geology Division Director <br /> RE: Amendment No. 2 to the Sunlight Coal Mine Reclamation Project, PKA-0-1071 <br /> Thank you for your interest in the Pre-Bid Meeting. The following clarifications and amendments <br /> should be noted and incorporated into the bid documents: <br /> 1. The bid opening date is July 22, 1999 at 2:30 p.m. <br /> 2. The Time of Completion will be fourteen (14) calendar days. The project must be <br /> completed prior to October 8, 1999 in nor more than fourteen (14) consecutive working <br /> days. CONTRACTOR and PROJECT MANAGER shall mutually agree upon the start date <br /> of construction in order to ensure that the project is completed by no later than October 8, <br /> 1999. <br /> 3. During construction, it will be necessary to cross the drainage swale located immediately in <br /> front (south) of the collapsed mine entry. Upon completion of construction, the swale must <br /> be returned to its original, pre-construction condition. <br /> 4. Topsoil to cover the coal refuse may be generated either by salvaging the soil currently in <br /> place at the disposal area, or by pushing dirt from the hill immediately to the east of the <br /> disposal area over the coal waste. A minimum cover of eight inches (8") of soil material <br /> must be placed over all of the coal waste material. If material is excavated from the hill to <br /> the east, the excavated area must not be of a lesser elevation than the coal waste <br /> material. All trees and shrubs must be removed from within the footprint of the disposal <br /> area prior to placement of the coal waste material. Upon completion of topsoil application <br /> operations, the excavated hill to the east, if disturbed, must be graded so that the <br /> topography matches and blends with the adjacent landforms. The excavated area will be <br /> ripped to minimize soil compaction. The area will be roughened (see Task 2, Topsoil <br /> Salvage and Surface Roughening), and revegetated (Task 4, Revegetation) per <br /> specifications. <br /> 5. Note that at the coal waste disposal area and at the hillside to the east, if disturbed, weed <br /> free straw mulch will be applied to the surface of the topsoil immediately upon completion <br /> of topsoil application operations. Severe surface roughening, as described ion Task 2, <br /> Topsoil Salvage and Surface Roughening, will occur simultaneously with the mulch <br /> application so that the mulch is thoroughly incorporated into the soil. Mulch application <br /> 1 <br />