Laserfiche WebLink
The only other water zone yet to be encountered is the ore-bearing sandstone. Once the neutron <br />and gamma logs are run, the well will be completed as a water monitoring well in the ore <br />horizon. The plan is to use 4-inch, schedule 40, threaded PVC pipe. A; well screen with silica <br />sand pack will beset across the water zone. Bentonite pellets will be dropped in the annulus to <br />form a 5 foot-thick bentonite seal above the sand pack. Using the trimi pipe, the remaining <br />annulus will be filled with a 3% bentonite cement slurry. It will be pumped thru the trimi pipe in <br />100' lifts, back to the surface. <br />The surface and downhole aspects of the operation were considered to be in compliance with the <br />right-of-way at the time .of inspection. <br />E <br />E