Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action : Initial Reclamation Liability Estimate <br />Task description : spread topsoil over 8.07 acres <br />>: - <br />, <br />`.. <br /> <br />HOURLY EQUIPMENT COST .. <br />,. <br />~ •.. <br /> Basic machine : Cat D8R Series ll - 8U (2005) Horsepower : 310 <br /> Blade type : Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $57.40 NA <br /> Operating cost/hour : $77.43 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost hour : __ $32.78 NA <br /> Total unit cost/hour : $167.61 Total fleet cosUhour : $167.61 <br />_. <br />.. <br />_, , <br />_,. <br />MATERIAL QUANTITIES <br />initial Swell Loose <br />volume : 15,189 LCY factor : NA volume : 15,189 LCY <br />Source of estima ted volume :reclamation plans <br />Source of estimated swell factor : NA <br /> <br /> <br />HOURLY PRODUCTION _ ,. _ <br />Job Condition Correction Factors ,. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.10 _ (Cat HB) <br />Unadjusted hourly production : 931.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 _ (fnd-rt) <br /> Push gradient : 1.36 (Cat Ht3) <br />Average push gradient : 16.50 % (neg) Altitude : 1.00 (Cat Ht3) <br />Average site altitude : 6, 800 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.67 <br />Weight description <br />Earth - Drv packed <br />Adjusted unit production : 625.26 LCY/hr <br />Adjusted fleet production : 625.26 ~ LCY/hr <br />