Laserfiche WebLink
• RECLAMATION COSTS <br />EXHIBIT L <br />The reclamation scenario resulting in the highest cost occurs at the conclusion of mining, since most of <br />the Whirlwind bench, vent shafts, and a portion of the waste embankment will need to be reclaimed. <br />The entire Packrat portal, road, and power drop area will need to be reclaimed. Each portion of the <br />reclamation is discussed in detail in Exhibit E. The costs of the reclamation tasks are calculated in the <br />following attachments. <br />Attachment A is the calculation of the surface disturbance reclamation bond required. The total <br />reclamation bond required for the surface disturbance is $148,372. Attachment B is the bond <br />calculation to build the Whirlwind Bulkhead Seal. The total reclamation bond required for the <br />construction of the Whirlwind Bulkhead Seal is $111,450. Attachment C is the bond calculation to <br />build the Packrat Contingency Bulkhead Seal in the case that it is needed. The total reclamation bond <br />• required for the construction of the Packrat Contingency Bulkhead Seal is $115,256. Attachment D is <br />the summary of the total reclamation bond costs that are required. The total amount of reclamation <br />bond that will cover all the reclamation activities at the Whirlwind Mine is $375,078. <br />:. <br />Whirlwind Mine 07 (rev. April 08) L-1 <br />