Laserfiche WebLink
• <br /> <br />• <br />Since the length of road is l,G6U feet, the volume needed to rut and till is 1,537 cubic yards. Four large <br />water bars will also he installed in approximately the same location as those installed during previous <br />reclamation activities. 'phis will require about 15 cubic yards of additional cut and till per water bar <br />hringing the total cut and till quantity to 1,597 cubic yards. The water bars will he constructed using a <br />small, track-nununed hydraulic excavator. <br />Much of the road fill is well vegetated and contains the original topsoil from the road excavation; <br />therefore no topsoiling of the till is needed. It will he left in a rough loose condition to enhance <br />revegetation. Boulders will be used to construct berms in the narrower portions of the Packrat Road <br />where a soil berm would he too wide. During reclamation, these boulders will be salvaged and later <br />used to block the entrance to both the Packrat and Whirlwind access roads. <br />{f'hu•Irrrrrcl A1tne U7 (rci~. A/~ri/ OS) F..-13 <br />