My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-11_PERMIT FILE - M2007044 (18)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-07-11_PERMIT FILE - M2007044 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:32 PM
Creation date
7/16/2008 8:14:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
7/11/2008
Doc Name
Introduction & Exhibit A thru K (volume 1)
From
Energy Fuels Resources Corp.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following structures will be removed at the Packrat Portal area: <br />- Retaining wall, approximately 300 feet in length, with an average height of 8 feet and a <br />maximum height of 22 feet. This wall will be made of steel supports with wood beams. <br />- Concrete jersey barriers of 100 feet total length, which will be hauled off site and re-used. <br />- Up to four steel bins for the loading of ore and waste. These bins will be 22 feet high for truck <br />loading underneath, and an upper bin storage area of 12 feet x 12 feet. <br />- Shop door, approximately 12 feet wide by 8 feet high. This door will be removed and the <br />opening blocked in prior to regrading. <br />No other structures will require removal at the Packrat portal. <br />7. Remove Foundations at Whirlwind and Packrat Portals <br />The shop and dry/admin building rest on concrete foundations that are 60 feet x 43 feet and 20 feet x <br />• 50 feet, respectively. The foundations are 6 inches thick with rebar. This is a volume of 66 cubic yards <br />of concrete. An additional 2.5 cy of rebar-reinforced concrete and 5 cy ofnon-reinforced concrete will <br />be removed at the ore pad sump and helipad, respectively. The material will be removed with a Cat D- <br />7 dozer equipped with a hydraulic concrete breaker or equivalent. The material will be loaded in trucks <br />and hauled underground or off site. <br />The Packrat bins will have up to 16 concrete footers of 3-foot depth and 2-foot diameter. <br />8. Install Bat Gate at Packrat Portal and Seal Shop Area <br />A steel bat gate will be welded into place at the main Packrat portal. An 8-foot by 12-foot block wall <br />will be constructed over the door opening into the underground shop. <br />C, <br />Whirlwind Mine 07 (rev. April 08) E-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.