My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-11_PERMIT FILE - M2007044 (18)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-07-11_PERMIT FILE - M2007044 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:32 PM
Creation date
7/16/2008 8:14:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
7/11/2008
Doc Name
Introduction & Exhibit A thru K (volume 1)
From
Energy Fuels Resources Corp.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 3. Seal Decline and Other Areas of Ground Water Inflow <br />The Whirlwind Mine will require the installation of a bulkhead seal in the lower portion of the decline <br />to ensure that the water seeping into the decline from the lower Brushy Basin aquifer is not allowed to <br />enter the mine workings. The lower bulkhead will be constructed near the base of the decline within a <br />zone of competent sandstone of high compressive strength. The hydraulic loading on this seal is <br />expected to be relatively low i.e., about 38 feet of hydraulic head based on a maximum of 630 feet of <br />Brushy Basin intercept on a 6 % grade. However, the seal design is based on the assumption that the <br />water will back to the surface. Design details and the estimated costs of the seal are presented in <br />Appendix K <br />Energy Fuels will also attempt to seal off other ground water inflows into the mine that may still exist <br />at the time of closure. This will likely consist of grouting and/or sealing of areas where water may be <br />seeping into the mine through natural fractures or more permeable zones. The cost of a contingency <br />seal in the Packrat workings has been included in the reclamation bond as described in Appendix L. <br />• Energy Fuels and the Division of Reclamation, Mining and Safety believe that the likelihood of a seal <br />in the Packrat workings is low, however, the Division requested the additional bond so that its potential <br />cost is covered for a worst case scenario. <br />The ground water-bearing zone above the Whirlwind seal is perched and present only at the base of the <br />channel sandstone unit; therefore, the water level behind the seal is expected to stabilize at or near the <br />ground water inflow point within the decline. Energy Fuels will monitor the water elevation above the <br />lower seal until it reaches equilibrium plus an additional 5 quarters (i.e., 1.25 years). Once the <br />monitoring period is completed, the remainder of the mine site can be reclaimed. <br />4. Place Ore Pad Liner, Pad Cover Material, and Treatment Sludge in Mine <br />Over the life of the mine, percolation of rain water through the ore stockpile may result in <br />radionuclides leaching into the compacted pad immediately below it; therefore, the 3.5 feet of cover <br />material and the ore pad liner will be excavated over the 0.5-acre stockpile area shown on Map C-2. <br />This material will be disposed of inside the mine above the seal and water pool. This area of the <br />Whirlwind Mine 07 (rev. April OS) E-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.