My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-15_PERMIT FILE - X200822901
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200822901
>
2008-07-15_PERMIT FILE - X200822901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:41 PM
Creation date
7/15/2008 3:13:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200822901
IBM Index Class Name
PERMIT FILE
Doc Date
7/15/2008
Doc Name
Federal Approval of COC 0 088199, Hole Number CCU029
From
BLM
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Stipulations <br />Colorado Coal Resources <br />Exploration Plan 2008 <br />(CO-100-2008-075CX) <br />1. All exploration drill holes must be capped with at least five feet of cement and plugged <br />with a permanent plugging material that is unaffected by water or hydrocarbon gases and <br />will prevent the migration of gases and water in the drill hole under normal hole pressures. <br />The Lessee, using cement or other suitable plugging material approved by the Little Snake <br />Field Manager, shall plug the hole through the thickness of the coal bed(s) or mineral <br />deposit(s) and through aquifers for a distance of at least 50 feet above and 50 feet below the <br />coal bed(s) or mineral deposit(s) and aquifers or to the bottom of the drill hole. A lesser <br />cap or plug may be approved by the Little Snake Field Manager. Item A illustrates the <br />minimum requirements for plugging drill holes. <br />2. The requirements for submission of geologic and abandonment information provided in <br />Item B (attached) shall be followed. <br />3. If buried cultural or Paleontological resources are discovered during exploration operations <br />under this plan, the Lessee shall immediately notify the Field Manager and shall not disturb <br />such discovered resources until the Field Manager issues specific instructions. <br />a. Within 5 working days after notification, the Field Manager shall evaluate any <br />cultural resources discovered and shall determine whether any action may be <br />required to protect or to preserve such discoveries. <br />b. The cost of data recovery for cultural resources discovered during exploration <br />operations shall be borne by the Lessee if the Lessee is ordered to take any <br />protective measures. Ownership of cultural resources discovered shall be <br />determined in accordance with applicable law. <br />4. All waste material will be contained on site in a trash cage or other portable storage <br />device and hauled to a county approved landfill. No hazardous materials / hazardous <br />wastes or trash shall be disposed of on lands under this plan. If a release does occur, it <br />shall be reported to this office immediately. <br />5. All drill holes will be geophysically logged with natural gamma, density, resistivity, and <br />caliper curves. <br />6. To avoid disturbance to wintering elk, no operations will be allowed to occur from <br />December 1 to April 30 if severe winter conditions exist. This restriction may be waived <br />by-the Authorized Officer if requested by the Lessee and severe winter conditions do not <br />exist. Because severe winter conditions are not predictable, drilling may be allowed <br />under a waiver with the understanding that when winter conditions are determined to be <br />severe, all drilling must cease until conditions moderate. Determination of severe winter <br />conditions will be done by BLM Little Snake Field Office in consultation with Colorado <br />Division of Wildlife. Once it has been determined that severe winter conditions exist, the <br />BLM authorized officer will notify the Lessee that no new drilling starts will be allowed <br />and all on-going operations will cease no later than 5 days from the date of notification <br />Drilling will be allowed to resume at such time when BLM and CDOW determine that <br />conditions have moderated to the point where big game are no longer in danger.
The URL can be used to link to this page
Your browser does not support the video tag.