Laserfiche WebLink
GENERAL CONDITIONS OF THE CONTRACT <br /> Article 1. - DEFINITIONS <br /> A. Contract Documents. The Contract Documents consist of: <br /> (a) Agreement and Bid Schedule; <br /> (b) Performance and Payment Bonds; <br /> (c) Liability, Automobile and Workmen's Compensation Certificates of Insurance; <br /> (e) Notice to Proceed; <br /> (f) General Conditions of the Contract; <br /> (g) Detailed Special Conditions, including all amendments issued prior to the opening of the <br /> bids and including any applicable Standard Work Specifications; <br /> (h) Maps and drawings, including all amendments issued prior to the opening of the bids; <br /> (i) Final inspection and certificate of completion; <br /> 0) Notice of Contractor's Settlement, and <br /> (k) List of Equipment Offered. <br /> B. Procedural Documents.The Procedural Documents consist of: <br /> (a) Advertisement for Bids; <br /> (b) Bid form; <br /> (c) Bid Bond; <br /> (d) Notice of Award; <br /> (e) MBE/WBE Forms; and <br /> (f) AML Contractor Ownership and Control Information Package; <br /> (g) Three-Way Agreement for Reclamation Activities, if required <br /> C. Correlation and Intent of the Documents <br /> The Contract Documents are complementary;what is called for by any one document shall be as binding <br /> as if called for by all. The intention of the documents is to include all labor and materials, equipment and <br /> transportation necessary for the proper execution of the work. Materials or work described in words which <br /> have a well-known technical or trade meaning shall be held to refer to such recognized standards. <br /> In case of a difference between the contract documents, precedence shall be given in the following <br /> respective order: Agreement, Bid Schedule, Special Conditions, Standard Work Specifications, Maps, <br /> Drawings, and General Conditions. Amendments shall take precedence in the area of the bid document <br /> which they modify or clarrfy. In the case of any such difference,the matter shall be promptly brought to the <br /> attention of the Principle Representative who will make a determination in writing. <br /> D. Words and Terms Used <br /> PRINCIPLE REPRESENTATIVE OR STATE-The term Principle Representative means the Director of the <br /> State of Colorado Division of Minerals and Geology (DMG) or his designee. The Colorado Division of <br /> Minerals and Geology is located at 1313 Sherman Street, Room 215, Denver, Colorado, 80203,telephone <br /> (303)866-3567. <br /> PROJECT MANAGER-The term Project Manager means the Division of Minerals and Geology employee <br /> or representative responsible for day to day observation of work at the project site, and general contract <br /> administration for the DMG. <br /> CONTRACTOR-The term Contractor means'the sole proprietorship, partnership, or corporation entering <br /> into a Contract with the State of Colorado. <br /> Colorado Division of Minerals&Geology GENERAL BID SPECIFICATIONS <br /> 1996 Page1 <br />