Laserfiche WebLink
Article 11. JOB PROGRESS REPORTS <br /> The Contractor will be required to properly complete weekly or daily progress reports, forms for which will <br /> be provided by the Principle Representative. Completed reports must be submitted to the Principle <br /> Representative prior to or at the time of requests for payment. Payment requests will not be processed until <br /> progress reports corresponding to the payment period are received. <br /> Article 12. CORRESPONDENCE FROM THE CONTRACTOR <br /> All correspondence from the Contractor to the Principle Representative shall be submitted to the Project <br /> Manager with a copy to: <br /> Colorado Division of Minerals and Geology <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> (303) 866-3567 <br /> Fax (303) 832-8106 <br /> Article 13. MATERIALS <br /> Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, <br /> equipment, light, power,transportation and other facilities necessary for the execution and completion of the <br /> work. <br /> Unless otherwise specified,all materials shall be new and both workmanship and materials shall be of good <br /> and uniform quality. The Contractor shall, if required,furnish satisfactory evidence as to the kind and quality <br /> of materials. <br /> Article 14. PREFERENCE OF BIDDERS AND MATERIALS <br /> The selection of materials and equipment for the work shall be in accordance with the laws of Colorado and <br /> the Buy American Act,(41 U.S.C. 10) as follows: <br /> A resident bidder shall be allowed a preference against a nonresident bidder from a state or foreign <br /> county equal to the preference given or required by the state or foreign county in which the <br /> nonresident bidder is a resident. (Title 8-19-101 to 102, CRS, as amended). <br /> The Buy American Act provides that the Government give preference to domestic construction \ <br /> material. The Contractor agrees that only domestic construction material will be used by the <br /> Contractor,subcontractors, matedalmen and supplies in the performance of this agreement,except <br /> for foreign construction material, 'rf any, listed.in this agreement. <br /> Components,used in this clause,means those articles,materials,and supplies incorporated directly <br /> into construction materials. Construction material,as used in this clause, means an article, material <br /> or supply brought to the construction site for incorporation into the building or work. Construction <br /> material also includes an item brought to the site pre-assembled from articles, materials or supplies. <br /> However,emergency life safety systems, such as fire alarm systems,which are discrete systems <br /> incorporated into a public building or work and which are produced as a complete system, shall be <br /> evaluated as a single and distinct construction material regardless of when or how the individual <br /> parts or component of such systems are delivered to the construction site. Domestic construction <br /> material, as used in this clause means (a) an unmanufactured construction material mined or <br /> produced in the United States,or(b) a construction material manufactured in the United States, if <br /> the cost of its components mined produced, or manufactured in the United States exceeds 50 <br /> percent of the cost of all its components. Components of foreign origin of the same class or kind <br /> as the construction materials determined by the Principle Representative or designee not to be <br /> mined, produced or manufactured in the United States in sufficient and reasonably available <br /> commercial quantities of a satisfactory quality,shall be treated as domestic. <br /> Colorado Division of Minerals&Geology GENERAL BID SPECIFICATIONS <br /> 1996 Page 5 <br />