My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-11_PERMIT FILE - M2008027
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008027
>
2008-07-11_PERMIT FILE - M2008027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:33 PM
Creation date
7/15/2008 9:51:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008027
IBM Index Class Name
PERMIT FILE
Doc Date
7/11/2008
Doc Name
110c application amendment
From
Black Diamond Minerals, LLC
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
110 Permit Application <br />Colorado Division of Reclamation, Mining and Sa <br />' Response: Equipment costs are all inclusive of operator wages, benefits, fuel and <br />lubricant, consumption, and depreciation. Mobilization and demobilization costs are <br />included from Rifle, Colorado. <br />(B) Rule: All items referenced in the Reclamation Plan must be included in the cost <br />calculation. These items in addition to earthwork, such as building demolition, fencing, <br />monitoring well sealing or stream channel reconstruction must also be included in the <br />reclamation cost estimate. <br />1 Response: All items in the reclamation plan are included in Table 2. <br />' (C) Rule: After the direct costs noted above have been estimated, the Office may add up to <br />an additional maximum 18.5 percent of that total, which includes private contract, typical <br />overhead costs. This additional cost is required to cover indirect costs that an <br />' independent contractor would incur when performing reclamation of the site. Five <br />percent additional cost shall be added to cover Office administration cost in the event of <br />bond forfeiture and permit revocation. <br />' Response: The applicant acknowledges the Division's need to add up to an additional <br />18.5 percent of the estimated third party reclamation costs for private contract, typical <br />' overhead costs and an additional 5 percent cost to cover Division administration in the <br />case of bond forfeiture and permit revocation. <br />Table 2_ TenP_P_ Park Raneh ghala Rnrrnw Pit Rnrlnmaf;An RnnA Cc#irr»te <br />ITEM Unit Price Units Quantity Total <br />Mobilization/Demobilization $1,500.00 lump sum 1.0 $1,500 <br />410 Backhoe $95.00 hour 40.0 $3,800 <br />Trackhoe $140.00 hour 40.0 $5,600 <br />Seed mix $200.00 acre 0.35 $70 <br />Laborers $30.00 hour 40.0 $1,200 <br />Erosion Control Mat $3.00 square and 1750.0 $5,250 <br />Silt Fence $2.00 linear foot 330.0 $660 <br />Miscellaneous Materials $500.00 lump sum 1.0 $500 <br />Straw Mulch $250.00 acre 0.35 $90 <br />Total - - - $18,670 <br />Notes: Johnson & Sons Excavating provided equipment costs; Granite Seed provided seed costs. <br />Tetra Tech April 2008 (July 2008 Application Amendment Page) 15
The URL can be used to link to this page
Your browser does not support the video tag.