Laserfiche WebLink
i <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />June 2008 Monthly Report <br />Page 2 <br />Table 1- June 2008 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitoring Site Date Depth to Water (feet) <br />M-4R 6/30/08 0 <br />M-6 6/30/08 D <br />M-7 6/30/08 D <br />M-8 6/30/08 D <br />M-9- 6/30/08 142.02 <br />_ <br />M-10 6/30%08 25.79 <br />M-11R 6/30/08 42.55 <br />M-12 6/30/08 178.32 <br />M-13R 6/30/08 129.83 <br />M-14 6/30/08 134.77 <br />M-15 6/30/08 85.80 <br />M-16 6/30/08 22.26 <br />M-19 6/30/08 24.93 <br />M-21 6/30/08 19.07 <br />M-22 6/30/08 17.44 <br />M-26 6/30/08 16.47 <br />M-32 6/30/08 43.43 <br />M-33 6/30/08 53.76 <br />M-34 6/30/08 23.23 <br />BF-4 6/30/08 24.84 <br />BF-6 6/30/08 30.81 <br />LS-1 6/30/08 D <br />LS-2 6/30/08 D <br />LS-3 6/30/08 Dry <br />LD-1 -6/30/08 D <br />LD-2 6/30/08 D <br />LD-3 6/30/08 D <br />Table 2 - June 2008 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P6 6/30/08 D 72.46 0.00 <br />P7 6/30/08 Dry 92.50 0.00 <br />P8 6/30/08 96.64 97.51 0.85 <br />P9 6/30/08 71.76 72.30 0.54 <br />P10 6/30/08 57.75 58.30 0.55 <br />P11 6/30/08 40.88 41.80 0.92