MAR.12 '99 2:27PM DMG,GJCT 1 303 2410336 P.2 <br /> $TAJE (" COLOFvADa <br /> • MVISIf)rI OF MINFRp1,5 ANn GfgI0CY <br /> fUypartment of N,vura)Re�nurre. <br /> 1313 Shuman 5t.,Room 215 <br /> Donver,Colorado 80203 DIVISION or <br /> Phone:(303)866.3567 r-AX:1303)832-8106 MINE 1tA L S <br /> GEOLQGY <br /> It <br /> MINING-SAFETY <br /> March 12, 1999 gill Owens <br /> Govcmor <br /> Greg E.Walchw <br /> Ewutivr Dirr w <br /> Mr. Kent Van Roosendaal Michwl 9.Long <br /> U. S. Bureau of Reclamation Division oitecwr <br /> 2764 Compass Drive <br /> Grand Junction, Colorado <br /> 81506 <br /> RR: Sediment Removal, Paonia Reservoir <br /> Dear Mr. 'Van Roosendaal: <br /> The Division of Minerals and Geology is about to begin remedial work at the previously reclaimed <br /> Hawks Nest Mine, located near Somerset, Colorado, Although this mine was reclaimed some <br /> time ago, revegetation efforts at some portions of the mine site have been Iargely unsuccessful. <br /> Field observations indicate that the lack of vegetative success may be due to unfavorable soil <br /> structure. In order'to overcome this problem, the Division is drafting plans to amend the existing <br /> soils by incorporating organic materials and clay/silt/sand sized materials into the ground. We <br /> have identified the-sediment deposits within Paonia reservoir as a possible source for the inorganic <br /> materials which we need. <br /> The Division is interested in acquiring permission from the Bureau of Reclamation to excavate <br /> sediment materials located above the water line of Paonia reservoir. Currently, we estimate that <br /> about 8,000 cubic yards of material will be excavated and hauled from the reservoir to the Hawks <br /> Nest Mine. <br /> Our initial plan is to award a contract for the excavation and removal of the sediments from the. <br /> reservoir. Because we desire relatively dry, rather than wet, materials, we propose to begin <br /> operations in April, prior to the water level rising above the elevation of the sediments. <br /> We plan to complete excavation and hauling operations within twenty days of beginning work. <br /> Our contractor will be required to repair any damage to the ground surface above the normal <br /> water line so that the area is returned to its pre-construction condition. <br /> Please let me know whether the Bureau of Reclamation is willing to allow the excavation of the <br />