Laserfiche WebLink
REVISED BID SCHEDULE <br /> HAWKS NEST MINE MAINTENANCE PROJECT <br /> PKA-0-451 <br /> Item Description Quantity Unit Unit Price Amount <br /> 1 Mobilization/ <br /> Demobilization N/A Job N/A $ <br /> G <br /> 2 Surface Preparation N/A Job $ -7 2,20 $ -7 <br /> 3 Topsoil Application N/A Job N/A $ 38100,9 <br /> 4 Surface Roughening N/A Job N/A $ 2,0,0 00!2 <br /> Ln. <br /> 5 Channel Construction 300 Ft. $ C� $ �0004�—b <br /> 6 Revegetation 8 Ac. $ ,2,S00,— $ 2,0/000, <br /> 7 Mine Opening N/A Job DELETED DELETED <br /> Backfill <br /> 8 Equipment Rental <br /> A Dozer 16 Hour $ SO or_ $ <br /> B Backhoe 12 Hour $ f,b i $ 7),d <br /> C End Dump Truck 8 Hour $ O $ g <br /> 9 Post Construction 1,500 Ln. $ y $ p®= <br /> Sediment Control Ft. <br /> 10 Supply Topsoil 3,225 Cu. <br /> Yd. $ <br /> 11 Supply Manure 8 Acre $ $ �6�0 <br /> GRAND TOTAL $ c(q <br />