Laserfiche WebLink
REVISED BID SCHEDULE <br /> HAWKS NEST MINE MAINTENANCE PROJECT <br /> PKA-0-451 <br /> Item Description Quantity Unit Unit Price Amount <br /> i Mobilization/ <br /> Demobilization N/A Job N/A $ 4500.00 <br /> 2 Surface Preparation N/A Job $ 10124.00 $ 10124.00 <br /> 3 Topsoil Application N/A Job N/A $ 28320.00 <br /> 4 Surface Roughening N/A Job N/A $ <br /> Ln. <br /> 5 Channel Construction 300 Ft. $ 19.36 $ 5808.00 <br /> 6 Revegetation 8 Ac. $1090.00 $ :8720.00 <br /> 7 Mine Opening N/A Job DELETED DELETED <br /> Backfill <br /> 8 Equipment Rental <br /> A Dozer 16 Hour $ 70.00 $ 11 20.00 <br /> B Backhoe 12 Hour $ 50.00 $ 600.00 <br /> C End Dump Truck 8 Hour $ 50.00 $ 400.00 <br /> 9 Post Construction 1,500 Ln. $ 2.50 $ 3250.00 <br /> Sediment Control--- Ft.- <br /> 10 Supply Topsoil 3,225 Cu. $ 16.00 51600.00 <br /> Yd. $ <br /> 11 Supply Manure 8 Acre $ 230.00 $ 1840.00 <br /> GRAND TOTAL $ 1189 442.00 <br /> I <br />