Laserfiche WebLink
Walker to Berry <br /> March 30, 1999 <br /> Page 5 of 5 pages <br /> erosional feature, place road crossings, stabilize head erosion, furrow ditch slopes, plant trees. <br /> 8. 5 @ $10,444 = $52,000 <br /> 9. 1/2 dozer day @ $250. Riprap and textile @ $21,000 = $21,250 <br /> 10. 2 @ $3000 = $6000 <br /> 11. '/z dozer day @ $250, Riprap and textile @ $31,000 = $31,250 <br /> 12. 2 dozer days = 1,000 <br /> 13. est 20 acres, 100 seedlings/acre @ $0.28 each = $20,000 <br /> total = $131,500 <br /> Cost savings: Perhaps non-combustible demolition wastes (concrete, asphalt, etc.) would be <br /> available for a lot of the riprap (an alternative to landfill of such materials). A layer of rock <br /> could be placed over the waste to improve aesthetics. <br /> Cc: La Routten Jim Stark H ' <br /> Larry arty Ranney, Jim cArdle, and John Nelson <br />