Laserfiche WebLink
0. , 13/00 THU 10:28 FAX 9702411516 <br /> Minerals & Geology G Jct <br /> Q007 <br /> DIVISION OF MINE <br /> ANp STATE OeParlment of Natural R GFOlOGY OF COLQRADCSO[1rCe5O <br /> 1313 Sherman 5t.,Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 <br /> D I V I S I O N O F <br /> MINERALS <br /> L <br /> April 13, 2000 G IS p GO Y <br /> ANINGMSAFEON <br /> Mr. Henry Barbe <br /> Mountain Coal Company BII'Owens <br /> P.O. Box 591 <br /> Somerset, Colorado 81434 Cr"ti WatcherExecutive Director <br /> Michael a.Long <br /> RE: Hawks Nest Mine Reclamation Division Dire <br /> The Colorado Division of Minerals and Geology <br /> reclamation on a portion of the previously <br /> Intends to perform <br /> Somerset, Colorado, tt is our understanding muted Hawks <br /> additional <br /> wks Nest Mine near <br /> • own a portion of the property upon 9 t Mountain Coal Com an a�mplished. The a p WhICl1 additional reclamation will be Y may <br /> activities is located at the Most feay-tehy elysix acre area to be affected E <br /> north of the North Fork Portion of the Ha by reins site, <br /> amount of work ��the Gunnison and south of the old high sine site, <br /> rk may be accomplished north of the old highwayi Y A limited <br /> The anticipated Project area is loafed in the eastern Township 13 South ter half of Sect o�nd� allow. <br /> Range 90 West, Gunnison County, Colorado. <br /> The reclamation work to be undertaken, whiff will severance tax funds which have been made available be accomplished <br /> focused on improving the quality, using cos; <br /> varsity to the Division, will be <br /> this area. Y, cover and diversity of tie vegetative cover at <br /> Reclamation will be Inducted on or about April 18� 200a and will for tessthan gos The first stage will begin <br /> haul and stockpile soil and or <br /> Widening Project. It it anticipated that these one week. Contractors will <br /> panic materials generated by the Highway 133 <br /> to, and south of, the old highway materials will be stockpiled adjaCent <br /> The second stage of the Project will be accomplished <br /> Reclamation construction is tentatively scheduled hed in the fall of 2000. <br /> October, 2000, and will last a to begin the second week of <br /> materials, alon Pproximately two weeks. The soil and or <br /> g with other snit amendments, will be incorporated into <br /> Some contouring and drains e completion of These activities, revegeol on of may <br /> also area we a the ground. IV <br /> accomplished. Upon <br /> ill occur. <br /> l� <br />