Laserfiche WebLink
w <br /> STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> tM1 <br /> ION OF <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 E RA L S <br /> FAX:(303)832-8106 & <br /> GEOLOGY <br /> RECLAMATION <br /> MINING-SAFETY, <br /> Bill Owens <br /> Governor <br /> Greg E.Walcher <br /> _DATE: February 17,2000 Executive Director <br /> Michael B.Long <br /> TO: ALL CONTRACTORS BIDDING ON THE FRUITA MINE/AMERICAN SHIELD BOND Division Director <br /> FORFEITURE <br /> FROM: PAUL KRABACHER,PROJECT MANAGER <br /> PHONE 970-248-7253 <br /> RE: AMENDMENT No. 1 TO PKA-0-455 <br /> I would like to thank-you all for attending the pre-bid meeting held today for the Fruita Mine bond forfeiture site. <br /> Below are the changes or additions to the bid. <br /> The Bid Document should be FRUITA MINE/AMERICAN SHIELD BOND FORFEITURE/C-81-015 <br /> not M-81-015 ii <br /> 1. Enclosed is a Bite map of the proposed work for bid. Also enclosed is a post reclamation map showing existing <br /> contours WITHOUT the developed gulley and associated deposition resulting from the 1999 flood. <br /> 2. The project Time of Completion has been extended to 35 calendar days after the receipt of the Notice to Proceed <br /> with project work scheduled to commence April 3,2000. <br /> 3. All terms and conditions of the Invitation and Bid other than as changed by Amendment No. 1 and this <br /> amendment remain the same. <br /> 4. Receipt and acceptance of this amendment will be acknowledged by returning the Receipt and acceptance of <br /> Amendment 1 to PKA-0-455 sheet attached. <br /> M:\imp\KRH\AMENDME.NTS\FRUITA.PK.doc <br />