Laserfiche WebLink
June 2008. It is our understanding that the fines being produced at the wash plant, which consists of 10 to <br />20 percent of the total materials being produced, are being pumped underground into the mine. <br />Based on our limited observations, it appears that the pile is currently being constructed and maintained in <br />general accordance with the project specifications and plans submitted under 2.05.3(8) and that the <br />potential hazard to human life and property at the site in its present condition is minimal. The only <br />exception to this is the present condition of the roadways at the site. This report fulfills the quarterly <br />inspection requirements as specified by Rules 4.09.1(11)(a), 4.09.1(11)(b), 4.10.2(2)(a) and 4.10.2(2)(b). If <br />you have any questions regarding t* report or our observations, please contact this office. <br />Sincerely, <br />NWCC, INC., <br />Brian D. L ' <br />xc: Dan Hern rw- S <br />pecialist <br />Job Number: 99-3983 NWCC, Inc. Page 2