Laserfiche WebLink
TRINIDAD BASIN MINE <br /> MVC-MINES-348 <br /> BID SCHEDULE <br /> AMENDMENT #1 <br /> Unit <br /> Task Description Q�t i� Unit Price Amount <br /> 1 . Mobilization/Demobilization, per specs 1 Job N/A $ 0• <br /> 2. Linden Avenue Lodaout coal removal and 1 Job N/A y <br /> reclamation, per specs 6-.. p o o, o d <br /> 3.A. Section 15 stream realignment, per specs. 350 LF $/'�. 90 SL1,,jj6_0 <br /> Upper stream realignment, no riprap, <br /> Drawing 2A. <br /> 3.13. Sec. 15 stream realignment with riprap, 200 LF $7" J $/y <br /> Drawing 2B <br /> 4. Pond 15-P10 removal, per specs, per 1 Job N/A <br /> specs <br /> 5. Reconstruction of Pond 22-P10, per specs 1 Job N/A $ ,5 0.00 <br /> 6. Ditch repair, culvert installation and rock 1 Job N/A $ <br /> swale construction, per specs <br /> 7. Spillway repair and clean-out of Pond 15- 1 Job N/A 53 .0_D <br /> P20, ditch removal, per specs <br /> 8. Spillway removal Pond 22-P4, per specs 1 Job N/A $�5 D D• O c7 <br /> 9. Ditch and gully repair, per specs 1 Job N/A $ 0 <br /> 10. Spillway repair Ponds 15-P1 1 and 12-P12, 1 Job N/A S D•D <br /> per specs <br /> 11 . Riser modification, Ponds 22-P5, 22-P6, 1 Job N/A $ 010 D <br /> and 22-P10, per specs <br /> 12. Trailer removal, per specs 1 Job N/A $4 OD. <br /> 13. Revegetation, per specs 1 Job N/A o.OD <br /> 14. Reforestation, per specs 1 Job N/A S 5 ,00 <br /> GRANDTOTAL -------------------------------------------------------------------- $ 630 <br /> L—L (Enter here and on Invitation and Bid sheet) / <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br /> h - <br />