Laserfiche WebLink
Original Drawing 2A <br /> Ground Channel Cross Section <br /> Surface <br /> 30 ft. <br /> -------- 3H:1V/ / <br /> 3 Sideslope / <br /> / ft. 12 ft. <br /> Original <br /> Ground <br /> Surface Drawing 2B 9" to 18" <br /> Riprap Channel Cross Section <br /> 3H:1V --- -- <br /> - Sideslop a -- <br /> 3 ft. /- - - 12 ft. <br /> Cross Section 1 <br /> Material to <br /> be moved Ditch <br /> 5 <br /> ............. 1% slope <br /> Existing Surface <br /> R.R. Ties <br /> Final Grade <br /> RAILROAD LOADOUT <br /> CROSS SECTION LOOKING NORTH <br /> scale as shown <br /> Fym.iDatel <br /> EVISIONS Colorado Department of Natural Resources <br /> Description Division of Minerals and.Geology <br /> Inactive Mine Reclamation Program <br /> ' Trinidad Basin Mining <br /> Reclamation Project <br /> Stream Channel and Loadout <br /> Cross Sections <br /> Drawn BKS Date 3/95 <br /> Scale Date Sheet No. <br /> Checked JBM DateXU as shown 3/95 1 of 1 <br />