My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-03-17_GENERAL DOCUMENTS - C1981048 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-03-17_GENERAL DOCUMENTS - C1981048 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 2:18:41 PM
Creation date
7/14/2008 10:09:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/17/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 1, 1995 <br /> Article 35. TEMPORARY SUSPENSION OF WORK <br /> The State, acting by and through the Project Manager, shall have the authority to suspend the work, <br /> either wholly or in part, for such period or periods as he or they may deem necessary due to: <br /> (a) Unsuitable weather, <br /> (b) Faulty workmanship; <br /> (c) Improper superintendence <br /> (d) Contractor's failure to carry out orders or to perform any provision of the Contract <br /> Documents; <br /> (e) Conditions which may be considered unfavorable for the prosecution of the work. <br /> Additional time will be added to the performance time for the contract for (a) above only. <br /> If it should become necessary to stop work for an indefinite period, the Contractor shall store all <br /> materials in such manner that they will not become an obstruction or become damaged in any way; <br /> and he shall take every precaution to prevent damage to or deterioration of the work, provide suitable <br /> drainage and erect temporary structures where necessary. <br /> Such Suspend Work Order shall be in writing and the Contractor shall again proceed with the work <br /> when so notified in writing. <br /> Article 36. ESTIMATED QUANTITIES <br /> The Contractor shall understand that: <br /> (a) The quantities and measurements set forth in the Special Conditions are in no case <br /> exact and in some instances the exact quantities and measurements are impossible to <br /> determine until after conditions have become known during construction; <br /> (b) The quantities shown in the Special Conditions are for use as a basis for comparing bids <br /> only; <br /> (c) The Principle Representative does not expressly, or by implication, agree that the actual <br /> amount of work performed or material furnished or installed will correspond therewith; <br /> (d) During the progress of the work the Principle Representative may find it advisable and <br /> shall have the right to make changes in locations of portions of the work, to omit <br /> portions of the work and to increase or decrease the quantities, as may be deemed <br /> necessary or desirable; <br /> (e) Under no circumstances or conditions will the Contractor be paid anything on account <br /> of anticipated profits upon the work or any portion thereof covered by the Contract <br /> which is not actually performed; <br /> (f) Under no circumstances or conditions will the Contractor be paid more than the unit <br /> price bid for any item of the Bid because the actual quantity is greater or less than the <br /> quantity shown in the Bid or Bid Schedule, and <br /> (g) Measurements of any openings have been made in sufficient detail to establish general <br /> shapes and dimensions. The locations and dimensions of vertical and horizontal <br /> openings and depths of materials shown on the documents as waste material, soil and <br /> unconsolidated material and rock material are approximate measurements only and shall <br /> be verified by excavation. <br /> DMG-1 1 <br />