Laserfiche WebLink
i <br /> i <br /> i <br /> Task 10 - Spillway Repair <br /> Work Description <br /> The emergency spillways of Ponds 15-P1 1 and 15-P12 shall be lowered one and one-half <br /> 0 1/2) feet to accommodate a total of 3 feet of riprap. Riprap material must consist of <br /> durable irregular rock having a minimum D-50 of 6 inches and a D-max of 9 inches. Riprap <br /> will have to be imported (see Drawing #3). <br /> Measurement and Payment <br /> There will be no measurement for Task #10. Payment for Task #10 will be reflected under <br /> Item #10 on the Bid Schedule. <br /> Task 11 - Riser Modification <br /> Work Description <br /> Risers on the primary spillways of ponds 22-P5, 22-136 and 22-P10 shall be cut so that twelve <br /> inches of vertical pipe remains. <br /> Measurement and Payment <br /> There will be no measurement for Task #1 1. Payment for Task #1 1 will be reflected under <br /> Item #1 1 on the Bid Schedule. <br /> .Task 12 - Trailer Removal <br /> I <br /> Work Description <br /> The white, 40-foot house trailer and aill trash associated with the trailer site located in the <br /> south central portion of Section 15 shall be removed and disposed of in an approved landfill. <br /> Measurement and Payment <br /> There will be no measurement for Task #12. Payment for Task #12 will be reflected under <br /> Item #12 on the Bid Schedule. <br /> R <br /> 10 <br />