Laserfiche WebLink
APR 13 '95 08:58RM DIV/MINERALS&GEOLOGY <br />ATE OF COLORADO <br />P.2/3 <br />Agreement <br />Project Name: Trinidad Basin Mining <br />Project No.: MVC-MINES-348 <br />This Agreement is between the State of Colorado, by and acting and through the Department of Natural <br />Resources, Division of Minerals and Geology, hereinafter called the PRINCIPAL REPRESENTATIVE, and Kessler <br />Reclamation, P.O. Box 41, Rockvale, Colorado 81240, hereinafter called the CONTRACTOR. <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br />available and a sufficient uncommitted balance thereof remains available for encumbering and subsequent <br />payment of this contract, subject to any additions and deductions, as provided for in Article 47 of the <br />General Conditions of the Contract, the sum of Sixty-Five Thousand, Eight Hundred and Thirty-Five Dollars <br />(S6 835.00 ), [Fund Appr , GBL , Contract Encumbrance Number <br />1 as provided for in Article 38, of the General Conditions of the Contract; and <br />WHEREAS, the legislature has declared it to be a State policy that reclamation of land' affected by mining <br />is both necessary and proper and to promote the reclamation of mined areas left without adequate <br />reclamation which continue in their unreclaimed condition to degrade the quality of the environment or to <br />endanger the health or safety of the public (34-33-102 C.A.S. as amended); and, <br />WHEREAS, The Governor has designated the Division of Minerals and Geology as the agency responsible <br />for inactive mine reclamation in Colorado; and <br />WHEREAS, one of the duties of the Inactive Mine Reclamation Program is to cooperate with other State <br />agencies and institutions in the implementation of the Colorado Mined Land Reclamation Act and the <br />Colorado Surface Coal Mining Reclamation Act (34-21-101 C.R.S. as amended); <br />NOW THEREFORE it is hereby agreed that: <br />1. Th"gntractor agrees to furnish all the work, labor and materials and perform all the work required - <br />for the complete and prompt execution of everything described or shown in, or reasonably implied <br />from the Contract Documents, including the Drawings and Specifications for the above described <br />project. <br />2, The Contractor agrees to do the work in a first, class, substantial and workmanlike manner to the <br />satisfaction of the State of Colorado and its Project Manager in strict accordance with the provisions <br />of the Contract Documents, including the Drawings and Specifications. <br />3. The Contractor agrees to complete the entire project within 40 calendar days from the date of the <br />Notice to.Proceed, to begin work within ten, (10) days from the Notice to Proceed and to prosecute <br />the work' with due diligence to completion. <br />4. The Contractor agrees that the completion of the project within this time limit is an essential feature <br />of this Agreement and agrees to proceed with due diligence, taking all precautions and malting all <br />necessary arrangements to insure the completion of the work within the prescribed time. <br />5, The Contractor agrees that his failure to complete the work within the time allowed shall be <br />cmnsidered as a breach of the Contract and entitle the State of Colorado to collect Uquidated <br />Damages for delay in completion, in accordance with Article 40, of The General Conditions and the <br />Special Conditions of the Contract. <br />(over) <br />.; t