Laserfiche WebLink
PART I <br />Page No. 10 <br />Permit No. COG-850000 <br />ALTERNATE LIMITATIONS FOR ACID OR FERRUGINOUS MINE DRAINAGE <br />FROM COAL REFUSE PILES AND FROM STEEP SLOPE AREAS OR MOUNTAINTOP REMOVAL <br />OPERATIONS <br />Any discharge or increase in the volume of a discharge caused by precipitation within any 24 hour period greater than <br />the 1-year, 24-hour precipitation event, but less than or equal to the 10-year, 24-hour precipitation event (or snowmelt <br />of equivalent volume) may may substitute the following limitations for these specific parameters only, subject to <br />burden of proof requirements described in Part I.B.6 <br />- - Lutitaticins T -- - - - - Monitoring Sample <br />ararneter 30 Day <br />P 7-Day Daily Rationale Frequency Type <br />. <br />-- " - - - - -----_ _ Federal Effluent Limitation Guideline Weekly Grab <br />Total Suspended Solids, mg/1 Report NA <br />A Report Federal ELG <br />ort Federal ELG <br />Re Weekly Grab <br />Total Manganese, mg/1 Report N p <br />Total Iron, mg/1 <br />Existing Sources (before5/4/84) <br />New Sources (after 5/4/84) <br />Settleable Solids, ml/l <br />6. Burden of Proof Requirements <br />The permittee has the burden of proof when requesting relief from total suspended solids (TSS), total iron, and/or settleable e has <br />control solids limitations. Relief shall be granted only when necessary and shall not be granted hn when the perms to The Division shall <br />over the discharge. The permittee should endeavor to meet the primary limitations <br />have final authority in determining whether relief is granted. <br />a) For rainfall, to waive TSS and total iron limitations, it is necessary to demonstrate that discharge occurred within 48 <br />hours after measurable precipitation has stopped. To waive settleable solids limitations, it is necessary to prove that <br />discharge occurred within 48 hours after precipitation greater than the 10-year, 24-hour event has stopped. <br />b) For snowmelt, to waive TSS and total iron limitations, it is necessary to demonstrate that discharge occurred within 48 <br />hours after pond inflow has stopped To waive settleable solids limitations, it is necessary to prove that discharge occurred <br />within 48 hours after pond inflow volume greater than the 10-year, 24-hour event has stopped. <br />The Division shall determine the adequacy of proof. As part of this determination, the o could Division have been matte whe her thl <br />permittee could have controlled the discharge in such a manner that primary dewatering of ponds that are equipped with automatic dewatering systems must meet TSS, total iron, and total <br /> manganese <br />limitations. If a pond has only manual dewatering capability, relief is available only to the extent required to regain <br />necessary stability and capacity. <br />7. Compliance Schedules <br />Any compliance schedule related requirements will be included in the certifications. <br />8. WET Testing <br />a. Acute WET Testing (See also Part I33.7.c for WET requirements applicable to both chronic and acute WET testing) <br />i <br />1. Testing and Reporting Requirements <br />Tests shall be done at the frequency listed in Part I.B.1. Test results shall be reported along with the Discharge <br />Monitoring Report (DMR) submitted for the end of the reporting period when the sample was taken. (i.e.,' WET <br />testing results for the calendar quarter ending March 31 shall be reported with the DMR due April 28, etc.) The <br />results shall be submitted on the Acute Toxicity Test report form, available from the Division. Copies of these <br />reports are to be submitted to the Division along with the DMR. <br />The permittee shall conduct each acute WET test in general accordance with methods described in Methods for <br />Measuring the Acute Toxicity of Effluents and Receivrng Waters to Freshwater and Marine Ortranisms EPA/600/4- <br />?,.??„ o...,.., ,„,,,tifi-I t,v rhP mnct current Division guidance document entitled <br />Report NA Report Federal ELG <br />Report NA Report <br />PP r%rt NA 0.5 Federal ELG <br />Weekly Grab <br />W