Laserfiche WebLink
r <br /> TRINIDAD BASIN MINE <br /> MVC-MINES-348 <br /> BID SCHEDULE <br /> AMENDMENT #1 <br /> Unit <br /> Task Description Qty Unit Price Amount <br /> 1 . Mobilization/Demobilization, per specs 1 Job N/A $&2 <br /> Z90.O <br /> 2. Linden Avenue Lodaout coal removal and 1 Job N/A <br /> reclamation, per specs 6. 000, 00 <br /> 3.A. Section 15 stream realignment, per specs. 350 LF $!,?. 90 $ _0 <br /> Upper stream realignment, no riprap, <br /> Drawing 2A. <br /> 3.13. Sec. 15 stream realignment with riprap, 200 LF $7),I $ y 20 <br /> Drawing 2B <br /> 4. Pond 15-P10 removal, per specs, per 1 Job N/A ST__ <br /> specs <br /> 5. Reconstruction of Pond 22-P10, per specs 1 Job N/A $ 5 o 0.00 <br /> 6. Ditch repair, culvert installation and rock 1 Job N/A $ <br /> swale construction, per specs <br /> 7. Spillway repair and clean-out of Pond 15- 1 Job N/A $I YL—O.0 <br /> P20, ditch removal, per specs <br /> 8. Spillway removal Pond 22-P4, per specs 1 Job N/A $<5 D O• O <br /> 9. Ditch and gully repair, per specs 1 Job N/A $ , 0 <br /> 10. Spillway repair Ponds 15-P1 1 and 12-P121 1 Job N/A S D•0 <br /> per specs <br /> 11. Riser modification, Ponds 22-P5, 22-P6, 1 Job N/A $ 1260,00 <br /> and 22-P10, per specs <br /> 12. Trailer removal, per specs 1 Job N/A $ 00. <br /> 13. Revegetation, per specs 1 Job N/A $ v 0.00 <br /> 14. Reforestation, per specs 1 Job N/A S 50 0,00 <br /> GRANDTOTAL ----------------------------------------------------------------- $ Gur�g3u�0 <br /> (Enter here and on Invitation and Bid sheet) <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page, <br /> 4 <br /> f <br />