Laserfiche WebLink
Figure 5.7 - Well 89-1 is completed in the B-Groove aquifer. <br />89-1 <br />10000 0(: <br />1000 0n a Sodium <br />Conductivity <br />E 100 0[..I TDS <br />1000 { ---_---- --. -•-Bicarb <br />1 00 `I - <br />,y`?o p\?ryc? ?aoo aOCA,y`0o ,\ o°y?ao? caoo <br />Da to <br />Figure 5.8 Well FX-2 is complctcd in the Dissolution Surface aquifer. <br />EX-2 <br />5.1.4 Process Ponds <br />The process ponds at the NSI site have a secondary liner, which collects and directs any <br />condensation or leakage to the leak detection tube for removal. Weekly collection and removal of <br />leachate continued in 2007. Process pond infionnation is provided within the monthly reports. <br />13