Laserfiche WebLink
i <br /> DRAWING 1 _ <br /> _d <br /> c flow Construction <br /> A plans for a loose4ock <br /> check dam. <br /> a A, Section of the dam <br /> _ parallel to the 'cen- <br /> 9ee e terline of the gully. <br /> B IF B, Section of the dam <br /> at the cross section <br /> 3 of the gully.a = orig- <br /> inal gully bottom; b <br /> = original gully cross <br /> d d section; c = spill- <br /> c way; d = crest of <br /> freeboard;e = exca- <br /> vation for apron; g <br /> = end sill. <br /> e <br /> i <br /> I <br /> ' Original Drawing 2 <br /> Ground I Channel Cross Section <br /> Surface <br /> 30 ft. <br /> -------- ZHAV <br /> / 3/. ft. Sideslope /12 ft.-- <br /> REVISIONS Colorado Department of Natural Resources <br /> ym.iDate� Description Division of Minerals and Geology <br /> Inactive Mine Reclamation Program <br /> Trinidad Basin Mining <br /> Reclamation Project <br /> Stream Channel and Gheeit Oa+n <br /> Cross Sections <br /> Drawn Date <br /> Scale Date Sheet No. <br /> Necked Dates_ as shown <br />