My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-03-17_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-03-17_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 12:34:46 PM
Creation date
7/11/2008 2:29:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/17/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 7 -Spillway Repair and Clean-out of and 15-P20 and Removal o ssociated Ditch Pond <br /> 15-P20. <br /> Work Description <br /> Starting at the Ditch dischar a into pond 15-P20, the ditch shall be removed (filled) for a <br /> j istance of 350 feet north, nd graded to original contour. Revegetation shall be according <br /> Ito specifications in 20.0 vegetation, attached. <br /> The emergency spillway of Pond 15-P20 shall be lowered one (1) foot and graded to <br /> accommodate additional riprap (total riprap thickness of 2 feet-). Riprap material for the <br /> spillway must consist of durable, irregular rock having a minimuyni D-50 of 6 inches and D-max <br /> dp of 9 inches (See Drawing #3 ). Riprap will have to be imported` -Thy seitiment delta in pond" <br /> e� 15-P20 shall be removed, and the resulting material incorporated into the area to be reclaimed <br /> at Pond 15-P10. ( 5V " <br /> Measurement and Payment l /J <br /> There will be no measurement for Task #7. Payment for Task#7 will be reflected in a lump <br /> sum bid under Item #8 on the Bid Schedule. <br /> Task #8 - Spillway Removal Pond 22-P4. <br /> Work Description <br /> The emergency spillway shall be removed from Pond 22-P4, allowing free flow around the <br /> embankment. Care must be taken to not disturb portions of the embankment where <br /> vegetation is well established. Additionally a 10-foot section of Ditch 22-1310, shall be <br /> removed, and flow directed into Pond 22-P4. <br /> Measurement and Payment <br /> i <br /> There will be no measurement for Task #8. Payment for Task #8 will be reflected in a lump <br /> sum bid under Item #8 on the Bid Schedule. <br /> Task 9 - Ditch and Gully Repair <br /> Work Description <br /> Approximately 100 feet of the failed ditch to Pond 15-P8.s"a rbe rem f 11 ) an aded <br /> p� to original contour. The large adjacent gully resulting from this,-failure shall be? 1r d by <br /> creating a gentle swale 3 feet deep containing tT feet of riprap. The riprap matena ust <br /> consist of durable irregular rock having a minimum�D-50 of 6 inches and a D-max of 9 nches. <br /> ® Riprap will have to be imported and must be approv by the Project Manager prior hauling <br /> to the site. <br /> Measurement and Payment <br /> There will be no measurement for Task #9. Payment for Task #9 will be reflected in a lump <br /> sum under item #9 on the Bid Schedule. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.